User Manual, FD20 v2.3
Version 1.2
– December 2021
20
4 Prior to Commissioning
Prior to commissioning, it is important that all users of the machine have read and understood this
entire user manual as well as received training/instructions from your local supplier.
In addition, there are some practical measures that must be taken. These are described in the following.
4.1 Test of Internet Performance
To ensure that the communication strength between the robot and the RTK Base Station is sufficient, the
operator should perform initial tests of the internet connection. The tests must be performed both at the field
where the robot is expected to operate and at the desired Base Station location.
It is recommended to use a smart phone to perform the internet performance test and follow the procedure
below:
1.
Download a “Speed test” app to a smart phone or use the following link:
2. Test the internet connection and performance at the field where the robot is expected to operate and
at the desired Base Station location.
3. Evaluate the test result of download speed to determine whether the connection is acceptable or
additional testing is required:
a. If the initial test result is above 1 Mbps, the internet connection is perceived as acceptable.
b. If result is below 1 Mbps, additional tests are needed.
The illustration below shows how to perform the tests at the field:
4.2 SIM-card from FarmDroid
The Robot is delivered with a factory mounted Multi-SIM solution which will provide the best and safest
connection to the Robot. Subscription to this service and the data usage is free-of-charge for the first year.
The service will continue if the customer purchases a FarmDroid Care Subscription. For more information,
please contact your distributor.
Summary of Contents for FD20
Page 1: ...FARMDROID FD20 v2 3 ORIGINAL USER MANUAL Version 1 2 Effective from December 2021 ...
Page 7: ...User Manual FD20 v2 3 Version 1 2 December 2021 4 1 3 EU Declaration of Conformity ...
Page 10: ...User Manual FD20 v2 3 Version 1 2 December 2021 7 ...
Page 69: ...User Manual FD20 v2 3 Version 1 2 December 2021 B Operator Panel Schematics ...
Page 70: ...User Manual FD20 v2 3 Version 1 2 December 2021 C Wire harness Main Tube connections ...
Page 71: ...User Manual FD20 v2 3 Version 1 2 December 2021 D Wire harness Secondary Tube connections ...
Page 72: ...User Manual FD20 v2 3 Version 1 2 December 2021 E Wire harness Wire Connections ...