FUNCTIONAL TEST
At the end of the "complete inspection", carry out a functional test of all plants
in an area free from overhead obstacles and at ground level.
WARNING
IF THE MACHINE DOES NOT WORK PROPERLY, SWITCH IT OFF
IMMEDIATELY. WARN MAINTENANCE PERSONNEL OF THE PROBLEM. DO
NOT USE THE MACHINE UNTIL IT IS DECLARED SAFE TO USE.
Carry out a functional test as detailed below.
1. Carry out the operations as instructed, from the ground controls,
without any load in the cage.
a.
Activate the ground control, the lifting and the lowering of the work
platform;
b.
Ensure all machine functions are disabled when activating
(pressing) the emergency stop button;
c.
Check the correct operation of the manual descent valve.
2. From the control console of the cage, carry out the detailed
operations.
a.
Ensure the control console is correctly assembled and securely
fastened;
b.
Lift and lower the work platform checking that lifting and lowering
happen regularly;
c.
Activate all functions and check the correct operation of all end run
switches, main and activation switches:
Summary of Contents for PKS 1200E
Page 75: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 8...
Page 77: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 10...
Page 78: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 11...
Page 85: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 18...
Page 86: ...NOTES...
Page 87: ...Page left intentionally blank...