LOAD DATA
Before placing a load, make sure that it can be raised to the maximum height of the tower. Otherwise it could
cause an accident or damage the tower.
Figure 38
Place and position detal of the load.
Place of the load.
1.
Determine the position where the load is to be placed and consult the tower capacity. Never exceed.
2.
The "X" distance between the load is taken from the carrier to the end of the horns.
3.
When it is possible, place the load as close to the carrier. This prolongs the life of the tower.
TOWER
X in P1
(mm / inch)
X in P2
(mm / inch)
X in P3
(mm / inch)
X in P4
(mm / inch)
X in P5
(mm / inch)
FT6860
85
270
450
635
820
3.34
10.63
17.72
25
32.33
FT7045 / FT6033
100
260
425
580
3.93
10.23
16.73
22.83
FT6520 / FT5323
95
225
355
485
3.74
8.85
13.97
19.1
Figure 39