
88
6.10.6 Steam and water addition pipeline of upper conditioner
Fig.6-10a Structure diagram of steam and water addition pipeline of upper conditioner
(upper-pass steam pipeline SPTZ00291359)
Fig.6-10b Structure diagram of steam and water addition pipeline of upper conditioner (water
addition pipe SPTZ00291363)