Kit Includes:
1 • Sculpted Top Rail (with adjustable stair knuckles and spacers installed).
1 • Bottom Rail (with adjustable stair knuckles installed).
2 • Bottom Rail Brackets (PTP/OTP) Stair with screws.
Balusters
Top rail brackets sold separately.
Before Starting the Installation
Review all local building codes. Wear proper safety equipment.
Step 1
Mount & plumb surface post mount (bolts & shims not included).
Slide sleeve over post mount and check for plumb.
(See Step 1 illustration)
Step 2
With post plumb and sleeved, measure distance from post to post (see Step 2 illustration).
For TOP RAIL - deduct 3-1/4" from measurement.
For BOTTOM RAIL - deduct 2-1/2" from measurement.
NOTE:
All measurements apply to stair pitch between 32-38 degrees.
Step 2
2"
2"
TOP
BOTTOM
Top Rail- Deduct 2"
Bottom Rail- Deduct 1 3/4"
Top Rail- Deduct 2"
Bottom Rail- Deduct 1 3/4"
Bottom Stair Run
Top Stair Run
Post Sleeve intersects
Top or Bottom Rails
Mount & Plumb Surface Post Mount
(Mounting Bolts & Shims Not Included)
Step 1
909918
A310 ADJUSTABLE STAIR RAILING
INSTALLATION GUIDE
Review all local building codes before starting the installation.
Wear proper safety equipment.
ALWAYS LAY RAILING ON CLEAN & SOFT SURFACE TO AVOID DAMAGE
Kit Layout
www.FairwayRailing.com
FAIRWAY ARCHITECTURAL RAILING SOLUTIONS ©2017