26
4.2 S
WITCHING
ON
THE
E
QUIPMENT
4.2.1 E
NGINE
1.
Ensure all SCSI cables and terminators are connected.
See Section 5 Configuring
Disk Drives.
2.
Power up all SCSI devices.
3.
Verify monitor cable is connected and then power up the monitor.
4.
Ensure all Sync Input/Output cables are connected and secure.
5.
Turn down the master faders on the mixing console and disconnect any
speakers.
6.
Ensure all digital and analog Input / Output cables are connected and secure.
7.
Ensure MFX Console cable is connected and secure.
8.
Ensure 9 pin control cable is connected and secure.
9.
Power up the Engine via the switch on the back panel then press the switch
on the front panel.
At this point the system is booting up if all has gone to plan. Initially you will observe a
gray and blue text screen, containing system configuration information. The system will
continue booting until the Disk recorder program is loaded.
S
ECTION
4 - S
YSTEM
C
ONFIGURATION
4.1 I
NTRODUCTION
The following describes the procedure for powering on the Console and the Engine.
CAUTION : NEVER ATTEMPT TO ATTACH SCSI BASED DISK DRIVES OR OTHER CABLING
WHILE THE SYSTEM IS RUNNING. ALWAYS POWER OFF BEFORE CONFIGURING ANY
CABLES.
Summary of Contents for Prodigy 2
Page 57: ...57 B2 S URROUND M ONITOR S CHEMATIC...
Page 61: ...61 B3 6 M ONITOR B OX C ONNECTOR V IEW...
Page 62: ...62 B3 7 EDAC PINOUT DIAGRAM Each EDAC can have up to 18 circuits numbered 1 to 18...
Page 63: ...63 B4 MONITOR BOX EDAC CONNECTIONS...
Page 64: ...64...
Page 67: ...67 D1 DIMENSIONS D1 1 PRODIGY 2 ENGINE SURFACE AND MONITOR BOX 360mm 500mm 460mm...
Page 69: ...69 D1 2 PRODIGY 2 ENGINE POWER REQUIREMENTS Input 85 275 VAC 49 63Hz 300VA 10A 110V 6 3A 240V...