52
1 / INSTALLING YOUR APPLIANCE
•400 V 2N triphase hook-up
16
-amp fuse.
Separate the two phase wires (L1 and L2)
before hooking up.
NN
eeuu
ttrr
aall
GG
rroo
uunn
dd
PPhh
aass
ee
N
L
Green/yellow
Blue
Black-grey
Brown
NN
eeuu
ttrr
aall
GG
rroo
uunn
dd
PPhh
aass
ee 2
2
PPhh
aass
ee 1
1
N L1
L2
Blue
Green/yellow
Black-grey
Brown
•220-240 V monophase hook-up
32-amp fuse.
Warning
If the power cable is damaged, it
should be replaced by the manufacturer, its
after-sales service department or by a per-
son with similar qualifications to avoid dan-
ger.
For a 400 V 2N triphase hook-up, if your hob
malfunctions, check that the neutral conduc-
tor is properly connected.
These hobs must be connected to the power
grid via an electrical outlet that complies with
EIC publication 60083 or an all-pole cut-off
device that complies with installation regula-
tions in effect.
When power is first supplied to your hob, or
after an extended power outage, an indicator
light will appear on the control panel. It auto-
matically disappears after approximately 30
seconds, or as soon as any touch control on
the control panel is pressed. This display is
normal and, if needed, serves as an indication
to the after-sales service staff. In all cases, the
user of the hob should disregard it.
HOOK-UP
•
IMPERATIVE canning with pressure pads.
99637833_A_ML.qxp 29/11/2005 11:01 Page 52
Summary of Contents for I-200TR - 11-05
Page 17: ...17 ANOTACIONES PERSONALES ES 99637833_A_ML qxp 29 11 2005 11 00 Page 17 ...
Page 32: ...32 NOTAS PESSOAIS 99637833_A_ML qxp 29 11 2005 11 01 Page 32 ...
Page 47: ...47 NOTES PERSONNELLES FR 99637833_A_ML qxp 29 11 2005 11 01 Page 47 ...
Page 76: ...76 9963 7 7833 11 05 99637833_A_ML qxp 29 11 2005 11 02 Page 76 ...