background image

Step 1 

Step 2 

Step 3 

Step 4 

Lay the panels on the floor flap side down 

as pictured.

Lay the corners so they form the shape 

of the ball pit and create the bottom of 

the pit. Pull the flaps to the center of the 

shape. 

Stand the panels up. Making sure the flap 

is tucked under the panel. 

Make sure the panels meet as pictured 

above. 

Step 5

Step 6 

Step 7 

Step 8 

Begin tying the panels together with 

connecting string. Loop the string 

between the two bottom grommet holes. 

Take the string on the right and loop it 

through the second grommet hole. 

Pull the string through the grommet hole 

directly across from the second hole. 

Repeat with on the left side. The first and 

second grommets should look like the 

photo above.  

Assembly Instructions 

FABRICATION ENTERPRISES INC

     

• 

    PO Box 1500, White Plains, NY 10602 (USA)     

• 

    tel: +1-914-345-9300     

• 

    fax: +1-914-345-9800     

• 

    FabEnt.com

04/17

Summary of Contents for Sensory Ball Pit

Page 1: ... with foam padding and a reinforced vinyl cover Design allows for shape flexibility Fabrication Enterprises Inc PO Box 1500 White Plains NY 10602 USA tel 1 914 345 9300 800 431 2830 fax 1 914 345 9800 800 634 5370 FabEnt com Authorized CE representative RMS UK Ltd 28 Trinity Road Nailsea Somerset BS48 4NU UK EC REP 32 2400 32 2490 32 2401 32 2402 32 2403 32 2409 ...

Page 2: ...mbly pieces listed below Make sure there are no tears in the vinyl Make sure you are assembling the ball pit on a flat surface Vinyl covered panels Connecting string Balls 4 diameter Assembly Pieces FABRICATION ENTERPRISES INC PO Box 1500 White Plains NY 10602 USA tel 1 914 345 9300 fax 1 914 345 9800 FabEnt com 04 17 ...

Page 3: ...e Step 5 Step 6 Step 7 Step 8 Begin tying the panels together with connecting string Loop the string between the two bottom grommet holes Take the string on the right and loop it through the second grommet hole Pull the string through the grommet hole directly across from the second hole Repeat with on the left side The first and second grommets should look like the photo above Assembly Instructio...

Page 4: ...together as shown Repeat this process with the other panels until the pit can stand on its own Step 13 Fill the ball pit with balls and enjoy Assembly Instructions FABRICATION ENTERPRISES INC PO Box 1500 White Plains NY 10602 USA tel 1 914 345 9300 fax 1 914 345 9800 FabEnt com 04 17 Caution Make sure walls of ball pit are secure before use Check for tears or loose string prior to each use ...

Reviews: