>
>
>
>
10
UK
IRL
•
Some important requirements for a good functioning are
•
The wall-mounted terminal has to be at least 0,5 m off:
o
Corners of the building
o
Below eaves
o
Balcony's etc.
o
The roof mounted terminal has to be at a distance of at least 0.5 meters of
the sides of the roof, excluded the ridge
3.5
Using an existing chimney.
You can connect the appliance onto an existing chimney. The existing chimney then
functions as air supply, where a flexible stainless steel liner (to BS715) of 100 mm performs
the flue function.
Requirements:
•
Any existing chimney used as an air supply must only service this appliance.
•
A chimney that has previously been used for solid fuel must be swept before use.
•
The existing chimney needs to be airtight.
•
The existing chimney needs to have an opening of min. 150 x 150 mm.
•
The chimney needs to be intact and well looked after.
•
Use the adjustable roof-mounted-terminal especially made for this, and the chimney
connection set.
For more information see the manual ”Chimney Connection Set” delivered with the set.
Summary of Contents for Bright
Page 1: ...Bright Installation Guide IRL UK 40010660 0811 ...
Page 2: ...1 UK IRL General 1 1 1 2 1 3 ...
Page 3: ... 2 UK IRL 1 4 1 5 1 6 A B D C ...
Page 4: ...3 UK IRL Bright 2 1 2 2 2 3 2 4 Build in frame ...
Page 5: ... 4 UK IRL De mounting the Glass 3 1 3 2 3 3 3 4 3 5 3 6 3 7 ...
Page 21: ... 20 UK IRL Appendix E Dimensions Bright ...
Page 22: ...21 UK IRL Appendix F Dimensions Convection grid ...
Page 23: ... 22 UK IRL Appendix G Dimensions Service hatch ...