5. MECHANICAL INSTALLATION
F
Carry out the work with the power supply discon-
nected.
!
The installation must comply with Standards
EN 12453 and EN 12445.
Mark off the work site and prohibit access/tran-
sit. Before the barrier is fixed to the foundation there
are risks of tripping and falls.
When working in the box there are risks of cutting,
shearing, crushing hands due to the presence of
moving parts. Until the installation is completed,
the partially installed barrier must always be left
blocked and with the door and upper lid always
closed to prevent access to the electronic parts and
the moving mechanical pars.
Never install the beam before fixing the barrier body
and checking it.
Until the installation is complete, never leave the bar-
rier unguarded with the beam fitted. If the beam is
fitted, the barrier must be locked with the beam open.
If installation is outside, it must be done in good
weather without rain or gusts of wind. If it is
raining, an adequate shelter for the barrier must be
made until the mechanical and electronic installation
is complete.
Never manage the barrier by holding the board holder.
5.1 TOOLS REQUIRED
8-13-17-19
Spanner
4-6
Allen key
Level
TOOL with TORQUE ADJUSTMENT
Where necessary for safety, a torque wrench with the
specified tightening torque will be shown.
FASTENING TORQUE VALUE
The torque wrench and the tightening torque in Nm
is shown in the figures. E.g.: HEX WRENCH 6 set at
2.5 Nm
6
2.5
Nm