Extron electronics NBP 1200C Setup Manual Download Page 8

8

NBP 1200C • Setup Guide (Continued)

Step 7: Install Retractors

Retractors can be installed in a vertical, angular, or horizontal orientation. No adjustment of the enclosure screws is needed if 
the retractors are mounted vertically. To mount at an angle or horizontally, adjust the enclosure screws as shown below. When 
the Retractors are mounted horizontally, the retractor mechanism must be secured to the underside of the table (see the 

Cable 

Retractor Setup Guide

, available at 

www.extron.com

).

To secure the Retractors in the retractor bracket, follow the instructions in figure 9.

e

ON

OFF

PC

LAP

TO

P

MU

TE

ME

DIA

 PLA

YER

HD

MI 

1

HDM

I 2

Insert the pin through the 

Retractor mounting hole on 

the side of the Cable Cubby 

and Retractor assembly.

Secure the clip 

on the pin.

Insert Retractors 

into the Retractor 

bracket.

Secure the locking screw 

on each Retractor. Do not 

overtighten.

2

3

1

4

Figure 9. 

Installing Retractors

Step 8: Install Cables in the Cable Cubby

e

ON

OFF

PC

LAPT

OP

MUTE

ME

DIA

 PL

AYE

R

HDM

I 1

HDM

I 2

For cable pass-through applications, 

allow at least 36 inches (0.9 m) of 

cable loop for each cable.

Using zip ties, secure cables to the holes 

on the bottom of the Cable Cubby.

1

2

3

NOTE: 

Ensure there is no tension 

on the power cable.

Connect cables to the AV system 

and connect the AC power cord 

to any installed power module.

Figure 10. 

 Routing and Connecting AV Cables

Horizontal Mounting

Remove two enclosure screws 

(one on each side) from this position. 

Then mount the Retractors as shown at left.

Cable Release

Assembly

See the 

Cable Retractor Setup Guide

 for 

additional steps.

Angular Mounting

Remove the two enclosure screws, as shown 
above, and then follow this step:

Move the cable release assembly upward until 

the angular mounting hole is visible. Reinstall 

the enclosure screws in this hole (both sides).

CAUTION:

 

Risk of Electric Shock

. This 

equipment must be grounded.

ATTENTION :

 

Risque de choc électrique. 

Cet équipement doit être fixé au sol.

Summary of Contents for NBP 1200C

Page 1: ...NBP 1200C and Other Devices in the System Step 10 Set up the NBP for Network Communication Step 11 Configure the System Step 12 Test and Troubleshoot Step 1 Get Ready Preparation checklist Use the fol...

Page 2: ...ingle connectivity bracket is provided It can be used with either the AAP frame plate or the cable grommet plate Step 2 Prepare the Installation Site Cut the Table or Furniture ATTENTION Installation...

Page 3: ...r acc der au connecteurs est soulign voir CNC Wood Router ci dessous Extron ne sera pas responsable des erreurs de coupe Ensure the table surface is at least 0 50 inch 1 27 cm thick Assurez vous que l...

Page 4: ...e accommodates up to three single space AAPs Assembly procedures are shown in figure 2 at right Cable pass through module The cable pass through module accommodates up to eight AV cables Assemble the...

Page 5: ...cable pass through module and power module Insert the modules into the cable cubby as shown in figure 5 NOTES Extron recommends mounting the power module on the left side of the enclosure For any cabl...

Page 6: ...rd The panel is attached to the lid with a hinge that allows access to the buttons without the panel becoming completely detatched You can now return the lid to the fully open position 5 5 From the fr...

Page 7: ...st the enclosure Lower the Cable Cubby into the hole to test the fit If necessary carefully enlarge the opening plastic m on f the e e ON OFF PC LA PTO P MUTE MED IA PL AY ER HDMI 1 HDMI 2 2 1 3 Figur...

Page 8: ...2 3 1 4 Figure 9 Installing Retractors Step 8 Install Cables in the Cable Cubby e ON OFF PC LAPTOP MUTE MED IA PL AY ER HDMI 1 HDMI 2 For cable pass through applications allow at least 36 inches 0 9...

Page 9: ...plex level autodetected Data rates 10 100Base T Power over Ethernet PoE The NBP receives power at this port Default login credentials Username admin Initial password unit serial number Password after...

Page 10: ...for the control device NOTE See the Toolbelt Help File Global Configurator Help File and Global Scripter Help File as needed for step by step instructions and detailed information The help file for GC...

Page 11: ...Volume LEDs Volume LEDs light to act as a meter to indicate the volume level NOTE There is no item F for this NBP model G Cable Cubby lid The lid tilts back to 130 Friction washers ensure the lid hold...

Page 12: ...ettings to factory default values without affecting user loaded files Reset to Factory Defaults Press and hold the Reset button for 9 seconds After the Reset LED blinks three times release and momenta...

Page 13: ...13 This page is intentionally left blank...

Page 14: ...st the system make adjustments finalize configuration Save the project Cable the NBPs and the control processor or HCR receiver then apply power Cable all devices Prepare the installation site Get rea...

Reviews: