background image

2

NBP 1200C • Setup Guide (Continued)

Americans with Disabilities Act (ADA) compliance

When planning where to install the NBP button panels, you may need to consider factors affecting accessibility of the button 
panels such as height from the floor, distance from obstructions, and how far a user must reach to press the buttons. For 
guidelines, see sections 307 (“Protruding Objects”) and 308 (“Reach Ranges”) of the 

2010 ADA Standards for Accessible Design

 

available at 

http://www.ada.gov/regs2010/2010ADAStandards/2010ADAStandards.pdf

.

Included parts

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

2

2

2

2

2

2

2

2

2

5

5

5

5

5

5

5

5

5

5

1

1

1

1

1

e

21-525

-01LF

e

ON

OFF

PC

LAPTOP

MUTE

MEDIA PLA

YER

HDMI 1

HDMI 2

Figure 1. 

NBP 1200C Included Parts

Item

Qty

Item

Qty

Item

Qty

1

  NBP 1200C

1

6

  Retractor pin and clip

1

9

  Hole plugs

6 (3/8") 

2 (1/4")

2

  Connectivity bracket

1*

7

  6 pan-head mounting screws 

and star washers

8

3

  AAP frame plate

1

Extron removal tool (not shown)

1

4

  Cable grommet plate

1

8

  4-40 module screws

8

Extron Tweeker (small 
screwdriver) (not shown)

1

5

  Retractor bracket

1

Blank buttons (not shown)

1

NOTE:

  *A single connectivity bracket is provided. It can be used with either the AAP frame plate or the cable grommet plate.

Step 2: Prepare the Installation Site, Cut the Table or Furniture

ATTENTION:

 

Installation and service must be performed by authorized personnel only.

L’installation et l’entretien doivent être effectués par le personnel autorisé uniquement.

If the NBP will be installed into fine furniture, it is best to hire a licensed, bonded craftsperson to cut the access hole and
perform the physical installation so the surface will not be damaged.

S’il est prévu d’installer le NBP dans du beau mobilier, il est préférable de faire appel à un artisan autorisé et qualifié pour
couper le trou d’accès et réaliser l’installation de telle façon que la surface ne soit pas endommagée.

Follow all national and local building and electrical codes that apply to the installation site.

Respectez tous les codes électriques et du bâtiment, nationaux et locaux, qui s’appliquent au site de l’installation.

Site preparation

To prepare the site:

1.

Decide on the method for cutting a hole in the table (see the next page).

2.

Obtain the cut-out template. Verify that you have the correct cut-out template and dimensions (see the next page).

3.

Protect the surface prior to and during cutting so the surface is not damaged.

Summary of Contents for NBP 1200C

Page 1: ...NBP 1200C and Other Devices in the System Step 10 Set up the NBP for Network Communication Step 11 Configure the System Step 12 Test and Troubleshoot Step 1 Get Ready Preparation checklist Use the fol...

Page 2: ...ingle connectivity bracket is provided It can be used with either the AAP frame plate or the cable grommet plate Step 2 Prepare the Installation Site Cut the Table or Furniture ATTENTION Installation...

Page 3: ...r acc der au connecteurs est soulign voir CNC Wood Router ci dessous Extron ne sera pas responsable des erreurs de coupe Ensure the table surface is at least 0 50 inch 1 27 cm thick Assurez vous que l...

Page 4: ...e accommodates up to three single space AAPs Assembly procedures are shown in figure 2 at right Cable pass through module The cable pass through module accommodates up to eight AV cables Assemble the...

Page 5: ...cable pass through module and power module Insert the modules into the cable cubby as shown in figure 5 NOTES Extron recommends mounting the power module on the left side of the enclosure For any cabl...

Page 6: ...rd The panel is attached to the lid with a hinge that allows access to the buttons without the panel becoming completely detatched You can now return the lid to the fully open position 5 5 From the fr...

Page 7: ...st the enclosure Lower the Cable Cubby into the hole to test the fit If necessary carefully enlarge the opening plastic m on f the e e ON OFF PC LA PTO P MUTE MED IA PL AY ER HDMI 1 HDMI 2 2 1 3 Figur...

Page 8: ...2 3 1 4 Figure 9 Installing Retractors Step 8 Install Cables in the Cable Cubby e ON OFF PC LAPTOP MUTE MED IA PL AY ER HDMI 1 HDMI 2 For cable pass through applications allow at least 36 inches 0 9...

Page 9: ...plex level autodetected Data rates 10 100Base T Power over Ethernet PoE The NBP receives power at this port Default login credentials Username admin Initial password unit serial number Password after...

Page 10: ...for the control device NOTE See the Toolbelt Help File Global Configurator Help File and Global Scripter Help File as needed for step by step instructions and detailed information The help file for GC...

Page 11: ...Volume LEDs Volume LEDs light to act as a meter to indicate the volume level NOTE There is no item F for this NBP model G Cable Cubby lid The lid tilts back to 130 Friction washers ensure the lid hold...

Page 12: ...ettings to factory default values without affecting user loaded files Reset to Factory Defaults Press and hold the Reset button for 9 seconds After the Reset LED blinks three times release and momenta...

Page 13: ...13 This page is intentionally left blank...

Page 14: ...st the system make adjustments finalize configuration Save the project Cable the NBPs and the control processor or HCR receiver then apply power Cable all devices Prepare the installation site Get rea...

Reviews: