4 Install one or two power supplies (for switches that require them) and connect to an electrical
source.
See
Installing Internal Power Supplies
on page 185.
Note
Be aware of whether you are installing an AC-powered switch or a DC-powered switch.
The installation instructions are different depending upon what type of power is used.
5 Connect power to the switch.
Connecting Power to the Switch
6 For a stacked configuration, connect stacking cables.
Connecting the Switches to Form the Stack Ring
7 Connect network interface cables.
Connecting Network Interface Cables
on page 220.
8 Perform initial network connection and configuration.
Performing Initial Management Tasks
Safety Considerations for Installing Switches
Read the information in this chapter thoroughly before you attempt to install or remove an Extreme
Networks switch.
Ensure that proper ESD (electrostatic discharge) controls are in use before switch maintenance is
performed. This includes but is not limited to wrist straps that are grounded to the switch housing and
earth grounds.
Warning
Connect the chassis ground wire before you connect any DC power cables.
Disconnect the ground wire after you disconnect all DC power cables.
Take care to load the equipment rack so that it is not top-heavy. Start installing equipment at the
bottom of the rack and work up.
Do not cover vents that would restrict airflow.
Note
See
Safety and Regulatory Information
on page 396 for additional safety information.
See
on page 315 for additional information regarding regulatory
compliance certifications.
Pre-installation Requirements
Prepare the site for the installation, and ensure that you have the appropriate people and tools on hand.
Installing most ExtremeSwitching series switches requires two people to maneuver the switch and
attach mounting hardware.
Installing Your Extreme Networks Switch
ExtremeSwitching and Summit Switches: Hardware Installation Guide