Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing into the
rack.
Time and items required
Allow 15 to 30 minutes to complete the installation procedure.
The following items are required to install a device using the 1U, 1.5U, or 2U Mid-Mount Kit for Two-Post Racks (XBR-000165,
XBR-000175, and XBR-R000292).
•
#2 Phillips torque screwdriver
•
1/4 inch slotted-blade torque screwdriver
NOTE
You may need two people to install the device, one to support the device, while the other secures it into the rack.
CAUTION
Use the screws specified in the procedure. Using longer screws can damage the
device.
Parts list
The following parts are provided with the 1U, 1.5U, or 2U Mid-Mount Rack Kit for Two-Post Racks (XBR-000165, XBR-000175, and
XBR-R000292).
NOTE
Depending on the device type, not all parts may be used in an installation.
Installing the 1U, 1.5U, and 2U Mid-Mount Kit for Two-Post Racks (XBR-000165, XBR-000175, and XBR-R000292)
ExtremeSwitching VDX 6740 Hardware Installation Guide
9036108-00
51
Summary of Contents for ExtremeSwitching VDX 6740
Page 10: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 10 9036108 00...
Page 12: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 12 9036108 00...
Page 24: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 24 9036108 00...
Page 28: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 28 9036108 00...
Page 98: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 98 9036108 00...
Page 124: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 124 9036108 00...
Page 128: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 128 9036108 00...