Site Preparation
Planning Your Site
To install your equipment successfully, you should plan your site carefully. The site planning process
has three major steps:
Step 1: Meeting Site Requirements
Your physical installation site must meet several requirements for a safe and successful installation:
•
Building and electrical code requirements
•
Environmental, safety, and thermal requirements for the equipment you plan to install
•
Distribution rack requirements
Step 2: Evaluating and Meeting Cable Requirements
After examining your physical site and ensuring all environment requirements are met, you should
evaluate and compare your existing cable plant with the requirements of the Extreme Networks
equipment to determine if you need to install new cables (or cabling).
Step 3: Meeting Power Requirements
To run your equipment safely, you must meet the specific power requirements for the Extreme
Networks equipment that you plan to install.
NOTE
Review and follow the safety information before you install your equipment.
Meeting Site Requirements
This section addresses the various requirements to consider when preparing your installation site,
including:
•
Operating Environment Requirements
•
Rack Specifications and Recommendations
Operating Environment Requirements
You need to verify that your site meets all environmental and safety requirements.
Virtually all areas of the United States are regulated by building codes and standards. During the early
planning stages of installing or modifying your LAN, it is important that you develop a thorough
understanding of the regulations that pertain to your location and industry.
Building and Electrical Codes
Building and electrical codes vary depending on your location. Comply with all code specifications
when planning your site and installing cable. The following sections are provided as a resource to
obtain additional information.
Summary of Contents for Alpine 3802
Page 17: ...Part 1 Common Features ...
Page 18: ......
Page 32: ...32 Extreme Networks Consolidated Hardware Guide Summary of Common Switch Features ...
Page 33: ...Part 2 Site Planning ...
Page 34: ......
Page 56: ...56 Extreme Networks Consolidated Hardware Guide Site Preparation ...
Page 57: ...Part 3 Summit Switch ...
Page 58: ......
Page 104: ...104 Extreme Networks Consolidated Hardware Guide Summit Switch Models ...
Page 114: ...114 Extreme Networks Consolidated Hardware Guide Summit Switch Installation ...
Page 115: ...Part 4 Alpine Switch ...
Page 116: ......
Page 122: ...122 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Overview ...
Page 152: ...152 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Power Supplies ...
Page 158: ...158 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Management Module ...
Page 188: ...188 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series I O Modules ...
Page 194: ...194 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Fan Tray ...
Page 195: ...Part 5 BlackDiamond Switch ...
Page 196: ......
Page 202: ...202 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series Switch Overview ...
Page 218: ...218 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series Switch Chassis ...
Page 282: ...282 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series I O Modules ...
Page 290: ...290 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series Switch Fan Tray ...
Page 291: ...Part 6 Switch Operation ...
Page 292: ......
Page 296: ...296 Extreme Networks Consolidated Hardware Guide Initial Switch and Management Access ...
Page 297: ...Part 7 Appendixes ...
Page 298: ......
Page 340: ...340 Extreme Networks Consolidated Hardware Guide Module Technical Specifications ...