8. Undo the velcro from the marquee roof and
frame corners.

9. Release the peak cap from the centre pole
and remove rooftop for transportation. 

10. Fit the protective cover over the marquee 
frame and store roof within its protective bag.

6. Refer to ‘LIFT HERE To Take Down’ sticker
on the marquee. 

7. Grasp marquee truss bars and walk
marquee inwards.

A. Middle Leg. Push the lower leg button and
fully retract the front middle leg.

B. Corner Legs. Push the lower leg button(s)
and fully retract the front legs.

C. Back Middle Leg. Push the lower leg button
and fully retract the back middle leg.

D. Back Corner Legs. Push the lower leg
button(s) and fully retract the back legs.

<< RETURN TO STEP 4 ON  
PACK DOWN INSTRUCTIONS 

3MX6M PACK DOWN INSTRUCTIONS 

Recommended procedure below. For safety reasons it is recommended that 2 persons pack down any marquee.

Summary of Contents for X6 VELOCITY

Page 1: ...for security These are add on accessories that can be purchased separately All roof tie down straps MUST be attached and tensioned These security methods will maximise safety However due to the unpredictable nature of weather damage prevention is not guaranteed All folding marquees are considered temporary structures and MUST be packed down and stowed away in any adverse weather conditions such as...

Page 2: ...items and store them in protective coverings If your marquee needs to be positioned horizontally during transit you MUST remove the roof to prevent damage Ensure that the marquee is firmly secured to prevent movement whilst in transit Fit the Tie Down Straps Sandbags Steel Pins or Weight Plates and anchor the marquee in to position Please refer to the engineer certificates found on the website res...

Page 3: ...of the marquee tighten the ferrule toggle 9 Ensure the protective flap is resting over the truss connector This will protect the roof from wear Attach the roof straps by looping them around the frame and buckling the clip Tighten the strap as needed 3 Fit the roof to the frame 6 Refer to LIFT HERE sticker Grasp marquee truss bars 10 Extend one full side of marquee legs Using your foot stand on the...

Page 4: ...ooping straps around frame and engaging clip 3MX6M SETUP INSTRUCTIONS Recommended procedure below For safety reasons it is recommended that 2 persons set up any marquee PACK DOWN INSTRUCTIONS Recommended procedure below For safety reasons it is recommended that 2 persons pack down any marquee 2 Push the lower leg push buttons and fully retract the back legs 5 Push to release all 4 roof connector p...

Page 5: ...ars and walk marquee inwards A Middle Leg Push the lower leg button and fully retract the front middle leg B Corner Legs Push the lower leg button s and fully retract the front legs C Back Middle Leg Push the lower leg button and fully retract the back middle leg D Back Corner Legs Push the lower leg button s and fully retract the back legs RETURN TO STEP 4 ON PACK DOWN INSTRUCTIONS 3MX6M PACK DOW...

Page 6: ... tight MOVING WHEELED PROTECTIVE COVER with marquee fitted Check area path is clear of objects Holding top and bottom handles of protective cover lean the unit back until all weight is on wheels Push forward carefully 5 Fasten the nut on the inside of wheel until tight ENSURE WHEEL SPINS FREELY Repeat on other side 4 Equip the spanner provided Tighten the bolt on the outside of wheel until tight X...

Page 7: ...sitioned over the dimples 1 Lay marquee on its side over a bench or on the ground and extend the inner leg WHEELED MARQUEE MOVING INSTRUCTIONS 1 Ensure brakes are engaged 3 Hold marquee with 2 hands 4 Disengage the brakes 5 Open frame slightly Never wheel a fully collapsed marquee 6 Grasp one leg and pull marquee in the desired direction Never push 7 Engage the breaks and refer to the Setup Instru...

Page 8: ...gutter hooks through eyelets in roof flap face hooks inwards RAIN GUTTER INSTRUCTIONS HALF WALL INSTRUCTIONS 1 Attach half wall display connector to marquee leg Repeat on other side 3 Insert half wall display bar into connector and tighten the connector Repeat 4 Attach velcro tabs to marquee legs 2 Insert half wall display bar through half wall sleeve 5 Attach the half wall support to the display ...

Page 9: ... the adjustable poles in to the holes found in the horizontal awning rod 7 Twist the awning poles to extend or shorten and then reverse twist the poles to tighten 8 Hook and Eyelet Awning 2 Put wall hooks through eyelets in roof flap 2 Attach awning velcro to the velcro on marquee roof 6 Insert the ends of the adjustable poles in to the holes found in the horizontal awning rod 3 Insert the three p...

Page 10: ... Loop the rope around the hook Secure the bauble around the screw fastener 8 Position the banner pole on the base slide the white ring down to secure 2 Small Banners 2m Extend the banner pole to the designated 2m line and twist the pole until secure 3 Medium Banners 3m Extend the banner pole to the designated 3m line and twist the pole until secure 4 Large Banners 4m Extend the banner pole to the ...

Page 11: ...ears Q8 Quasar Frame 10 Years Wave Flare Banner Hardware 1 Year Cafe Umbrellas Frame 3 Year Star Shade Pole 1 Year Arch Tent Frame 3 Years EMX Inflatable Frame 5 Years Pavilion Frame 5 Years Pinnacle Frame 10 Years Crest Tent Frame 10 Years Table Covers 1 Year Pop Banner 1 Year Custom Banners Fence Wraps 1 Year Roller Banner 1 Year FABRICS Plain 500D PVC Coated Polyester 1 Year Printed 600D PU Coa...

Page 12: ...alance panels use a soft mop and any mild household cleaning fluid such as dish detergent mixed with warm water When cleaning the roof of your marquee we recommend that the tent is fully opened and secured into position Remove any leg extensions or accessories such as side walls as these can be cleaned separately We recommend that the roof of your marquee be cleaned regularly in proportion to the ...