![EXFO Power Blazer 88200NGE User Manual Download Page 214](http://html1.mh-extra.com/html/exfo/power-blazer-88200nge/power-blazer-88200nge_user-manual_2449938214.webp)
Test Setup - Test Configurator, Timer, and System
204
88000 Series
EtherSAM - Ramp
EtherSAM - Ramp
Note:
The
Ramp
tab is only available for configuration when the
Ramp Test
check box is selected (see page 193).
From the
Test
menu, tap
Setup
,
Test Configurator
, tap on the test block,
and on the
Ramp
tab.
Note:
The ramp configuration parameters are defined globally for all services but
the presence of CIR+EIR, and Traffic Policing steps are as per each service
configuration. CIR, CIR+EIR, and Traffic Policing steps are part of the step
list as soon as they are enabled for at least one service even if that service is
not enabled.
Dynamic Ramp
The graphic displays the percentage of each CIR level step in time.
Step Time
The step time is the test duration for each ramp step:
5
(default) to
60
seconds.
Ramp Duration
The ramp duration indicates the total time required to perform all the ramp
steps for each service.
Add Step
Allows adding a new ramp step. Enter the CIR percentage from
1
to
99
.
A maximum of 7 pre CIR steps can be added in the ramp configuration.
Summary of Contents for Power Blazer 88200NGE
Page 1: ...www EXFO com User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE...
Page 14: ......
Page 20: ......
Page 64: ...Test Setup Test Applications 54 88000 Series OTN BERT...
Page 71: ...Test Setup Test Applications Power Blazer 61 SONET SDH BERT For SDH BERT...
Page 76: ...Test Setup Test Applications 66 88000 Series SONET SDH DSn PDH BERT For SDH...
Page 620: ......
Page 726: ......
Page 752: ......
Page 756: ......
Page 768: ......
Page 886: ...0 5 1 5 48 5 0 176 W d y K y K D...