Test Setup - Test Configurator, Timer, and System
194
88000 Series
EtherSAM - Global
Subtests
Service Configuration Test
verifies if the network configuration is
correct for each service before starting a long term test (Service
Performance Test). To test the network configuration, an L2CP
Handling test, a ramp test, and/or a burst test is/are executed for each
configured service.
Subtest Duration
indicates the
Service Configuration Test
duration based on the configured Services, L2CP Handling, Ramp,
and Burst settings.
L2CP Handling Test
check box when selected (cleared by
default) verifies that L2CP frames are handled appropriately. Only
available with Dual Test Set.
Once the test is started, the configured quantity of L2CP frames for
the service under test are transmitted at the configured frame rate.
The test validates that the frames are received or not at the
destination (remote unit). Then, based on the Expected L2CP
Handling of each L2CP frame, a verdict is assessed for the service,
per L2CP frame, and per direction.
The L2CP Handling test is performed when enabled for each
enabled service.
Summary of Contents for Power Blazer 88200NGE
Page 1: ...www EXFO com User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE...
Page 14: ......
Page 20: ......
Page 64: ...Test Setup Test Applications 54 88000 Series OTN BERT...
Page 71: ...Test Setup Test Applications Power Blazer 61 SONET SDH BERT For SDH BERT...
Page 76: ...Test Setup Test Applications 66 88000 Series SONET SDH DSn PDH BERT For SDH...
Page 620: ......
Page 726: ......
Page 752: ......
Page 756: ......
Page 768: ......
Page 886: ...0 5 1 5 48 5 0 176 W d y K y K D...