![EXFO FTB-1 User Manual Download Page 423](http://html1.mh-extra.com/html/exfo/ftb-1/ftb-1_user-manual_2450042423.webp)
Test Results
NetBlazer
411
Summary (iSAM)
Summary (iSAM)
From the
Test
menu, tap
Results
, and the
Summary
tab.
Start Time
indicates the date and time the test has been started. The
date and time is reset every time the test is restarted.
Configuration/Performance Results
and
RFC 6349 Results
buttons
are used to respectively display summary results for
Service
Configuration Test
and
Service Performance Test
, or
RFC 6349 Test
when results don’t fit on one page.
Service Configuration Test and Service
Performance Test
The actual test status is displayed as follows:
Test Status
Description
“--”
Test has not started.
Disabled
Test/subtests is/are disabled.
Running
Test/subtest is currently running.
Data Transfer
Test/subtest is running but no test traffic is being transmitted.
Completed
, <Verdict> Test/subtest has completed with the test pass/fail verdict.
A fail verdict is declared when a Link Down or LOS is detected,
or when any SLA parameter fails.
Aborted
,
<
reason
>
Test/subtest has been aborted either manually (Stop) or
automatically from an alarm and the reason why the test has
been aborted is also displayed as follows:
Link down alarm
,
LOS alarm
,
Timeout during execution
,
DTS connection failed
,
Loss of remote connection (DTS)
,
Unresolved addresses
,
Stopped
Summary of Contents for FTB-1
Page 1: ...User Guide FTB 700G 800 Series NetBlazer for FTB 1 ETHERNET AND MULTISERVICE TESTER...
Page 12: ......
Page 20: ......
Page 22: ......
Page 52: ......
Page 59: ...Test Setup Test Applications NetBlazer 47 SONET SDH BERT For SDH BERT...
Page 64: ...Test Setup Test Applications 52 FTB 700G 800 Series SONET SDH DSn PDH BERT For SDH...
Page 84: ......
Page 98: ......
Page 298: ......
Page 574: ......
Page 652: ......
Page 674: ...0 5 1 5 48 5 0 176 W d y K y K D...