Manual Pauline TH-PROJ-UNI
Version 1.2
02.01.2020
Page 14 of 16
6. System maintenance and inspection (Re-examination)
The PAULINE does not require special maintenance but a visual inspection must
be done
prior to every installation
in which the system is involved:
Please make a visual inspection to be sure that all the screws on each arm
are in the right place and none are missing.
Make sure that the screws, nuts, arms, metal plate and all the components
are not bended, damaged, or broken.
If any parts are broken or missing, please contact the vendor for spare
parts.
Please control, with a corresponding tool, that all the screws are properly
tightened.
Do not exchange broken or malfunctioning parts with ones that are not
accredited by the manufacturer because serious injuries and property
damage can occur!
The inspection must be done by a qualified person!
One meticulous inspection must be performed every year. For that, a qualified
person needs to carefully check that none of the components are damaged or
broken.