
96
ELECTRICAL AND IGNITION
SENSOR TESTS
Connect red meter lea d to terminal “A” and black
meter lead to terminal “C.” Rotate the sensor lever
through it s range of trave l. Resistance reading
must change evenly as the sensor lever is moved.
Connect red meter lead on terminal “B” and black
meter lea d to terminal “C.” Ro tate the sensor
lever. Resistance reading must chang e evenly as
the sensor lever is moved.
Engine Temperature Sensor Test
Remove the ele ctrical connector from the engine
temperature sensor.
Use a digital multimeter to measure sensor resis-
tance.
Air Temperature Sensor (AT) Test
Remove the electrical connector from the air tem-
perature sensor.
Use a digital multimeter to measure sensor resis-
tance.
Engine Temperature Sensor Resistance
680
Ω
± 5% @ 212°F (100°C)
10000
Ω
± 1% @ 77°F (25°C)
32654
Ω
± 2.5% @ 32°F (0°C)
1.
Engine temperature sensor
006612
1
AT Sensor Resistance
680
Ω
± 5.25% @ 212°F (100°C)
10000
Ω
± 1.5% @ 77°F (25°C)
32654
Ω
± 3.0% @ 32°F (0°C)
1.
AT sensor
006613
1
Summary of Contents for E-Tec 40 HP
Page 1: ......
Page 2: ......
Page 226: ...224 POWERHEAD POWERHEAD VIEWS 2 Cylinder Front 008160...
Page 227: ...225 POWERHEAD POWERHEAD VIEWS 10 2 Cylinder Rear 008161...
Page 228: ...226 POWERHEAD POWERHEAD VIEWS 2 Cylinder Top 008162...
Page 229: ...POWERHEAD POWERHEAD VIEWS 227 10 2 Cylinder Top Rope Start Models 008186...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS 3 Cylinder Front 008166...
Page 233: ...231 POWERHEAD POWERHEAD VIEWS 10 3 Cylinder Rear 008167...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS 3 Cylinder Top 008165...
Page 374: ...S 2...
Page 416: ......
Page 420: ......
Page 422: ......
Page 425: ......
Page 426: ......