
245
MIDSECTION
EXHAUST HOUSING
12
Exhaust Housing Installation
Bring the exhaust housing into position with the
stern bracket.
Install four
new
lower mount screws with lock-
patch. Tighten screws to a torque of 38 to 45 ft.
lbs. (51 to 61 N·m).
Install powerhead. Refer to
20” Models
23036
25” Models
32590
Summary of Contents for E75DPLSCB
Page 1: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...
Page 2: ......
Page 231: ...POWERHEAD POWERHEAD VIEWS 229 11 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front ...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear ...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top ...
Page 302: ...S 2 ...
Page 349: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...