Maintenance:
In a timely manner the centralizer skeleton.
1.If the ground not level off, loose soil layer thickness is differ, wall shed may tilt to one end, once found, should be timely the centralizer, in case of deformation.
The shed may be slant when facing the un-level ground or loose soil layer, please righting the shed urgently to avoid deformation
2.Prevent increased loading-weight artificially.
Don't let any lentils, towel gourd, pumpkin and climbing fruits and vegetables to grow up on the canopy, otherwise if it is windy and rainy, skeleton is
unbearable, and easy to cause skeleton crack, broken, collapse Avoid kinds of vine plant climbing on the canopy, or it can not bearing for the wind and heavy
rain, broken,collapse may accured.
The sunshine board maintenance:
1.IIn the using canopy, note do not use sharp objects collision films, avoid to cut films. Be careful not collide with a sharp object films,in order to avoid scratched
films when using.
2.If films appear rupture, can use glue to repair or repair with transparent tape. Available polyurethane adhesive for repairing. Often keep the films clean, generally
the PC sheet replacement using 6 ~ 10 years later, so as not to affect the light transmittance. Using transparent tape adhesive to patch cracks of film when any
broken in case .Keep clean films,it will better replaced by new panels after 6-10years to avoid affect the Light transmittance
3.The flame retardant in polycarbonate material, but still need to stay away from fire, avoid softening deformation.
As Polycarbonate is fire-retardant materials, please stay away from the fire ,to avoid softening deformation.
Frame maintenance:
1.The frame is aluminum alloy structure, if there is a white problem can wipe with a cloth in time, under high temperature and wet environment.
All frames are made of alloy aluminum. White spots may appeared under wet-hot environment, just wipe it.
2.If there is any distortion calibration shall be carried out in a timely manner in order to avoid sunshine board out, If Polycarbonate out of frame, please removed
screws. Carried out in accordance with the manual installation steps, and partial restoration.Any distortion calibration shall be carried out in a timely to avoid the
sunshine board fall off. Repair work should be according to the IM.
3.If connection piece serious rust, should change in time the new screws and connectors to ensure connection parts are firm
Please replaced the serious rust screws and connection for stable.
How to do in bad weather:
1.If there is lightning may not stay in the shed, because aluminum alloy skeleton is conductive and will be caused serious consequences
Do not stay under shed when lightning.
2.Wind power reaches 70 km/h should be prepared ready to defense equipment, fixed wall shed. Fixed method with a strong rope or cable connect the cornice
work four Angle of anchor block inserted into the soil or tied in a nearby tree stem > 10 cm in diameter. Pay attention to the weather turns good dismantled after
the rope or cable to avoid injury and pedestrian.
Please get defensive measures when facing heavy wind (abt 70km/H). Reinforce by steel rope and anchors which insert into ground or Strapping on a big tree
3.Clear in time at the top of the deciduous leaves led to the decrease of the canopy transparency, heat preservation effect is reduced
To avoid greenhouses reduced transparency, heat preservation effect is reduced, please clean up the leaves at the top.
4.During snow, removal work in time, if not timely to snow removal, Use solid wooden plate supporting internal intermediate point and middle position of
polycarbonate, prevent snow collapsing the wall shed.
To prevent collapsing by snow, please remove the snow in time,Or support by a wooden stick support in the center of the sunshine board for reinforcement
Stick length 320cm±3cm
Summary of Contents for ZA510
Page 11: ...11 ZA B1 x2 B7 x2 B7 B7 ZA B1 ZA B1 B7 B7 ZA B1 ZA B1 x8 F4 F4 F4 F4 F4 F4 ZA B1 F4 F4 x14...
Page 26: ...26 A7L A7R ZA D9 F4 x2 F8 x4 ZA D9 ZA D9 F4 F8 x2 x2...
Page 31: ...31 ZA B1 x4 B7 x4 F4 x28 B7 B7 ZA B1 ZA B1 x2 B7 B7 ZA B1 ZA B1 x8 F4 F4 F4 F4 F4 F4 ZA B1 F4...
Page 36: ...36 Assembled above the foundation...
Page 38: ...38 B8 x2 F4 x10 x2 A4 A4 F4 F4 B7 x2 B9 x2 x2 B9 B8 B8 B7 F4 x4 B8 B9 B9 B8 B7 B7...
Page 40: ...B8 x2 B7 x2 B9 x2 40 F4 x10 x2 A4 A4 F4 F4 x2 B9 B8 B8 B7 F4 x4 B8 B8 B9 B9 B7 B7...
Page 42: ...42 Window W2 W2 W1 W1 W3 SW1 W4 W4 SW4 SW4 SW4 SW4 F4 F4 F4 F4 F10 F10 F11 F4 F4 P2 x4...
Page 43: ...43 x4 W1 x8 W2 x8 F4 x32 F10 x8 P2 W2 W2 W1 W1 F10 F10 F4 F4 F4 F4...
Page 45: ...45 x4 W4 x8 SW4 x16 W4 W4 SW4 SW4 SW4 SW4 F11 x4 F11 W4 SW4 SW4 Silicon Silicon...
Page 46: ...46 F4 x12 x12 F4 F4 x6 F4 x6 F4 F4 TA5 x1...
Page 50: ...50 A7A x4 F4 x8 x4 F4 x2 A7A x4 TA5 A7A F4 A7A TA5 F4 A7A x4 WA3A F4...
Page 51: ...51 Window Window TA5 W1 TA5 TA5 W1 Help to exclude rain 3mm 3mm x2 x2 x2 Window x4...
Page 53: ...53 TA5 Window W4 W5 F11 SW3 SW2 SW3 SW2 SW3 SW2 Close Open CW6 CW6 CW7 CW7...
Page 56: ...56 A12 x14 x14 A12 WA1A WA3A x4 P9 A7A A7A A12 WA1A WA3A P9 x4 J4 P9 CW7 F4 J4 J4 x4 P9 P9...
Page 63: ...63 F6 x6 Door Door F2 x6 F7 x24 C9 x4 L2 x2 L3 x2 F3 x8 J5 J2...
Page 65: ...65 F4 F9 Tighten all screws...