SANDBLASTER 0701AREN10MAS
9
7. USE INSTRUCTIONS
7.1. PRIOR OPERATIONS
Before starting the equipment, we must do the following operations:
To drain the air feeding hose to eliminate possible water condensations.
To check that compressor is capable to supply the air flow rate required. The air flow
rate depends on the type of work to be done (working pressure), that can be between
700
– 1000 l/min for the tip standard
3.
To check that every hose are in good condition (with no cracks no folds).
To check that connection of air feeding inlet is in good condition.
To check that water purifier filter
[Spare parts 1
– Posit.18]
is not full. As drain in not
automatic, you should drain it regularly.
To place the carriage handle
[Spare parts 2
– Posit.47]
which is received dismantled.
To fix the handle, slide the handle
[Spare parts 2
– Posit.47]
through the tubes welded to to
the body of the boiler and place the handle clamp
[Spare parts 2
– Posit.61]
.
To connect the air feeding hose to equipment.
7.2. TANK LOADING
To load the tank, you must follow the following steps:
To assure that tank is depressurized (manometer view
[Spare parts 1
– Posit.19]
).
To disconnect the equipment from compressor.
To unscrew the plastic cap
[Spare parts 1
– Posit.17]
located in the product inlet
[Spare
parts 1
– Posit.3].
To introduce the hopper with extension in the loading hole
[Spare parts 1
– Posit.3]
pressing into the inner product lid
[Spare parts 2
– Posit.13]
, and so, it will be opened.
To pour the abrasive product inside the tank until reach the wanted fill level.
To remove the hopper, allowing the inner product lid
[Spare parts 2
– Posit.13]
locks
automatically thanks to the spring system.
To check that there is no abrasive product on the loading hole causing lack of air
tightness on the locking or unnecessary joint wear
[Spare parts 2
– Posit.3]
.
To screw plastic cap
[Spare parts 1
– Posit.17]
into the original position.
To connect again the equipment to compressor.
The type of abrasive product (sand, metallic grain, glass, corindon, etc.) to be used, as
well as the granule diameter, depends on the type of work. To help to choose the abrasive
size according to tip diameter, please check Table 1.
7.3. WORKING PRESSURE REGULATION
Working pressure can be adjusted operating manually the regulator
[Spare parts 1
–
Posit.5]
, located in the regulation box
[Spare parts 1
– Posit.4]
.
The regulator can be operated with the equipment on.
To activate the regulator you must follow the following steps:
To raise the regulator control
To turn the control until reaching the appropiate working pressure which is shown
in the manometer.