00105768, Version 1.0
27/42
rear
(6)
DMX input
(7)
DMX output
(8)
Power input
(9)
Power output
(10)
Fuse holder
INSTALLATION
Rigging
The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
6
7
8
9
10
DMX OUT
DMX IN
100-240 V AC
POWER IN
50/60 Hz
FUSE
T2A/250V
1: Ground
2: Signal (–)
3: Signal (+)
POWER OUT
Summary of Contents for LED MFX-10 Beam Effect
Page 1: ......
Page 41: ...00105768 Version 1 0 41 42 610 mm 235 mm 215 mm ...