Euroflex EURO-flex Quick Installation Manual Download Page 6

 

 

 

Safety 

 

 

 

Quick installation guide_Conveyor system EURO-flex Al_20221111_EN.docx 

 

 

2.3 

Instruction of the personnel 

Each person assigned to carry out work must, before commencing, receive instruction from the 
owner regarding their delegated activities and potential dangers during work. 

For instruction, observe the following: 

 

Repeat instruction at regular intervals. 

 

Verifiably log each personnel instruction session. 

 
 
 

2.4 

Qualification requirements 

Safety note: Risk of injury due to insufficient qualification. 

If the conveyor system is used improperly, property damage may occur, or persons may be injured 
or killed. 

» 

All activities may only be carried out by personnel who have the required training, 
understanding regarding the functioning of the conveyor system and the relevant experience. 

 

Furthermore, special qualifications are required for certain tasks. These are defined as follows. 

 
 

2.4.1 

Specially trained personnel 

Specially trained personnel are persons who have been instructed on the tasks delegated to them 
and their potential dangers by the owner. 

 
 

2.4.2 

Operating personnel 

Operating personnel are persons who have been instructed on the tasks delegated to them and their 
potential dangers by the owner. The operating personnel are capable of operating the conveyor 
system independently. The operating personnel have been instructed regarding possible dangers in 
the event of improper behaviour. Cleaning and control tasks on the conveyor system are carried out 
independently. 

 
 

2.4.3 

Maintenance personnel 

Maintenance personnel are persons who, as a result of their technical training (e. g. mechanical, 
electrical, pneumatic), knowledge, experience and awareness of pertinent norms and provisions, are 
capable of correctly carrying out their delegated tasks. Maintenance personnel are capable of 
recognizing potential dangers independently, and consequently avoiding them. 

 
 

2.4.4 

Qualified specialist personnel 

Qualified specialist personnel are persons who have obtained and proven special experience, 
knowledge and skills for the safe performance of tasks in particular specialist areas (e. g. 
mechanical, pneumatic, hydraulic, electrical) and who fulfil the following defined requirements. 

 
 

 

Summary of Contents for EURO-flex

Page 1: ...Quick installation guide Conveyor system EURO flex aluminium...

Page 2: ...lexgmbh de Internet www euroflexgmbh de The document is protected by copyright All rights are strictly reserved Copying reproduction translation or conversion to an electronic medium or machine readab...

Page 3: ...ns 7 2 4 6 Specialist pneumatic personnel 7 2 4 7 Specialist hydraulic personnel 7 2 5 Personal protective equipment 7 2 6 Protective enclosure Protective cover 7 2 7 Spare parts and their purchase 8...

Page 4: ...e department will be happy to advise you on technical matters Information on ordering spare parts can be found in the section Spare parts and their purchase Page 8 Customer service Designation Specifi...

Page 5: ...2 2 Obligations of the owner The owner is obliged to implement measures that result from the specifications provided by the Machinery Directive 2006 42 EC The safety accident prevention and environme...

Page 6: ...asks delegated to them and their potential dangers by the owner 2 4 2 Operating personnel Operating personnel are persons who have been instructed on the tasks delegated to them and their potential da...

Page 7: ...neumatic equipment may only be carried out by specialist pneumatic personnel 2 4 7 Specialist hydraulic personnel Specialist hydraulic personnel are persons who as a result of their technical training...

Page 8: ...parts and accessories can be ordered directly from the manufacturer via the following contact Spare parts Contact Designation Specification Company euroflex GmbH Street no Hohe Flum Stra e 62 Postcod...

Page 9: ...he assembly of the machine Overview of EURO flex aluminium Page 9 Assembly the slide rails on the link chain conveyor Page 10 Assembling the link chain Page 13 3 1 Overview of EURO flex aluminium Fig...

Page 10: ...residues and splitters from the entire system area Check that the screw connections on all load bearing and moving parts are tightened correctly Check correct function of bearings and links Check the...

Page 11: ...w slide rail section with a narrow angle running direction see arrow Gently deburr the butt ends 7 Maintain a distance of approx 10 mm between the slide rail ends running direction see arrow 8 Do not...

Page 12: ...running direction 15 Using the drill drill bit 3 4 mm drill a hole in the slide rail and chassis Do not drill through slide rail The underside of the slide rail must not be drilled or protruding 16 Af...

Page 13: ...ion of the conveyor chain as shown in the illustration Info With the system size EURO flex 115 the running direction of the conveyor chain is opposite Variant 1 5 Insert the conveyor chain into the de...

Page 14: ...4 1 Personnel and Protective equipment Personnel and Protective equipment Specification Designation Personnel Operating personnel Personal protective equipment Protective equipment against the cleani...

Page 15: ...with a personal padlock The conveyor system is prepared for cleaning Ready 4 4 Execution Prerequisite conveyor system is switched off and secured against being switched on again conveyor system is pre...

Page 16: ...e regional guidelines and commission a specialist company if required Malfunctions and excessive levels of wear on individual components are likely to result from the use of operating substances that...

Page 17: ...protective devices for completeness and function 8 per shift Operating personnel Replace defective equipment Replace if required Maintenance personnel Check functionality of the operating and display...

Page 18: ...er transition End module for damage and wear 500 Maintenance personnel Flange bearing Check eccentric ring for secure seating 170 Maintenance personnel Check motor plate for secure seating 500 Mainten...

Page 19: ...intenance work Store the maintenance logs 5 4 Repair Incorrect repair work impairs the operational safety This can cause accidents and seriously injure people as a result Observe the following Repair...

Page 20: ...ry or death Prior to starting ensure that no persons are present in the danger zone Do not reach into moving machine parts during operation Maintain a safe distance from moving machine parts during op...

Page 21: ...250 OH 500 OH then check every 500 OH Replace after 4 000 OH Tools aids Steel pin 4 mm x approx 200 mm long Hammer Prerequisite System is switched off and safeguarded against being restarted Perform t...

Page 22: ...shoes Interval 1 000 Bh Quarterly Tool aid Caliper gauge Requirement System is switched off and secured against being switched on again Carry out the following work steps Check the wear of the convey...

Page 23: ...onveyor system EURO flex Al_20221111_EN docx 6 Table of figures Fig 1 Overview of EURO flex aluminium example 9 Fig 2 Assembly the slide rails 12 Fig 3 Assembling the link chain 13 Fig 4 Adjust link c...

Reviews: