The Retrofit

9

Step 2:

Mate the transition cards with the ribbon cable edge connectors as indicated 

below. Secure the ribbon cable connectors to the transition cards with wire ties. 

The tie wrap binding needs to be on the top for an Upper board and on the 

bottom for a Lower board for clearance.

 Clip wire tie ends for neatness.

Install the New Backplane & Make 

Connections

Step 1:

Set the DMX termination switches to 

off

The switches and their location are 

shown here.

Step 2:

Bend one arm of the backplane metal in towards 

the opposite arm (about 30 deg). Bend the metal 

as little as is possible to get it inside the rack.

Step 3:

Insert the backplane metal on an angle. Then 

straighten it once it is past the face of the rack. 

Push it into the rack far enough that it stays in 

place, but leave yourself some room to make the 

power and data connections.

Step 4:

Insert the power connection in the backplane 

power header. (Look at the pin shapes for proper 

orientation. It will only fit one way.)

Step 5:

Push the backplane the rest of the way into the rack. Be 

careful of the power connection you just made. Don’t let 

any of the wiring become stressed or get pinched.

Step 6:

Insert tabs in the side of the rack.

Step 7:

With the tabs fully inserted in the sides of the rack, pull the 

backplane towards the front of the rack to line up the 

screw holes in the upper side corners to line up.

Step 8:

Install one screw with a sleeve 

in each side upper-corner of the 

backplane. 

Match 

the red 

wire to 

pin-1 

and be 

sure the 

proper 

side is 

up

Wire tie the 

connectors 

together

Position of the 

tie wraps

On top for Upper

On bottom for Lower

Power

Screw with 

sleeve

Summary of Contents for sensor+ CEM+

Page 1: ...ouring Rack Retrofit Manual Revision A Copyright Electronic Theatre Controls Inc All Rights reserved Product information and specifications subject to change Part Number 7153M2300 Rev A Released June...

Page 2: ...I ETCNet2 EDMX Sensor and WYSILink are either registered trademarks or trademarks of Electronic Theatre Controls Inc in the United States and other countries Microsoft and Windows are registered trade...

Page 3: ...to alert you to danger or important information Americas ETC International Technical Services Department 3031 Pleasant View Road Middleton WI 53562 1 800 775 4382 1 608 831 4116 service etcconnect com...

Page 4: ...ansition boards Install the New Backplane Make Connections page 9 install the new backplane and connect and secure the data cabling Change out the AF Cards if present page 11 remove the existing Advan...

Page 5: ...el Mount Cat5 F to F Jack XLR case N2030 1 Hole Plug 375 dia 2617 Heyco HW624 1 SCR M3x 5x4mm PhOHMS BZ HWM1036 8 Shipped as Individual Parts Backplane Screw 8 32X3 8 PhPHMS HW377 2 CEM Backplane 1 8...

Page 6: ...arts Components ETC Part Number SP24 SP48 Additional Line Items Sensor AF Cards Optional 7150B5005 2 4 CEM 7150A1001 1 1 Required Tools 1 Phillips screwdriver 2 Phillips screwdriver Diagonal wire cutt...

Page 7: ...dimmer output edge connectors from the backplane metal Step 2 Carefully feed the dimmer output ribbon cables through the backplane individually As you remove the ribbon cables mark them with a permane...

Page 8: ...Discard the old backplane Control Input Panel Replacement Step 1 From the open left side of the rack remove the control data ribbon cable from the clips inside the rack Step 2 Remove the tour guides...

Page 9: ...to either the first or last pair of the beacon header show here Step 7 Feed the cables into the rack where the control input panel will go and reinstall the breaker with the same two screws Be sure t...

Page 10: ...Use that tie wrap mount to loosely secure the power harness to the side of the rack Leave the tie wrap loose enough for the power harness to slide backwards when the backplane is installed Data Cabli...

Page 11: ...ck Push it into the rack far enough that it stays in place but leave yourself some room to make the power and data connections Step 4 Insert the power connection in the backplane power header Look at...

Page 12: ...ug the 2 Ethernet cable into the RJ45 connector on the backplane Step 12 Dress the control data ribbon cable the beacon cable and the Ethernet cable neatly across the top of the rack The cables should...

Page 13: ...ginal 10 screws Change out the AF Cards if present Step 1 Remove the old AF cards pull the plastic tabs Step 2 Address the new AF cards mini switches as shown here Step 3 Install the cards in the slot...

Page 14: ...DMX on the ports if the DMX source is not present Configure the CEM Step 1 Configuration of the CEM is done via the front face panel interface or via a graphical HTML interface called Sensor Connect t...

Page 15: ......

Page 16: ...606 Tower III Enterprise Square 9 Sheung Yuet Road Kowloon Bay Kowloon Hong Kong Tel 852 2799 1220 Fax 852 2799 9325 Web www etcconnect com Email US mail etcconnect com UK mail etceurope com Asia mail...

Reviews: