Configure and Test Hoist Operation
30
Examine the System
Once the installation procedure is complete, take some time to verify that all of the proper steps
have been completed.
•
Inspect all cable terminations (lift lines) to make sure they are sufficient.
•
Inspect all lift lines to ensure they are plumb and in the right location.
•
Inspect all lift lines to ensure there are no twists.
•
Ensure that all of the SafeStop devices are open.
•
Work all slack out of any lift lines. Reinspect the FlyPipe to make sure it is level.
•
Remove loose tools, hardware, debris, and any other obstructions from the hoist,
distribution raceway, if applicable, and the immediate area around the system.