Standard System One-Cell Installation
15
Installation Spacing - High Output Luminaires
ArcSystem Pro One-Cell High Output luminaires must be installed with the spacings listed
below.
Install with minimum spacings between
a.
Center-to-center of adjacent luminaires: 609.6 mm (24 in)
b.
Top of luminaire to overhead building member: 76.2 mm (3 in)
c.
Luminaire center to side building member: 304.8 mm (12 in)
Supplies
The following supplies are required, but not provided:
•
½ in flexible conduit and conduit fittings, as needed
•
Romex or nonmetallic screw-clamp style conduit connectors for outputs
•
Phillips screwdriver
•
Four #10 screws and other mounting hardware as needed
Note:
Mounting hardware and installation location must support the weight of the
driver, conduit hardware, and all cable required for installation.
Electrical and Wiring Specifications
Install the driver on a power distribution system with reliably identified earthed neutral
(ground) and install a maximum 20 A circuit breaker on the line conductor. The D1, D2, and D4
Series drivers accept 100–277 VAC, 50/60 Hz. ETC recommends installing all wiring in grounded
metal conduit.
WARNING:
Circuits that are installed without an accessible power
disconnect device cannot be serviced or operated safely.
AVERTISSEMENT :
Il est imprudent d'utiliser ou de réparer les circuits
installés sans qu'un dispositif de déconnexion de l'alimentation ne soit
accessible.
Summary of Contents for ARCP1
Page 1: ...ArcSystem Installation Manual Part Number 7490M2100 Rev G Released 2019 11...
Page 6: ...iv ArcSystem Installation Manual...
Page 61: ...55...
Page 62: ...56 ArcSystem Installation Manual...
Page 63: ...57...