![eta PelletsCompact Installation Manual Download Page 33](http://html.mh-extra.com/html/eta/pelletscompact/pelletscompact_installation-manual_2430177033.webp)
Installation
Placement of the boiler
33
10 Installation
Assembly and installation only by qualified
specialist personnel
The assembly and installation may be performed
by specialist personnel with the corresponding
qualifications only.
10.1
Placement of the boiler
Bringing the boiler into the boiler room
The boiler shipps with four carrying tubes. Remove
the rubber caps on the right side of the boiler and
screw the shorter tubes into the boiler frame. Screw
both longer tubes into the left side.
Fig. 10-1: Carrying tubes
Transport the boiler into the boiler room. The required
clearances for installation and maintenance must be
maintained; see
.
10.2
Removing panels
Remove the cover on the top
Remove the cover from the top of the boiler.
Fig. 10-2: Cover
Removing the side cover
Remove the protective screen for the supply air of the
boiler.
Fig. 10-3: Protective screen
Summary of Contents for PelletsCompact
Page 1: ...2020 07 21 EN 0000000061 V 022 1513 93003 003 PelletsUnit 7 15 kW Installation ...
Page 41: ...Installation Network connection 41 ...
Page 45: ...Electrical connections Overview of circuit boards 45 ...
Page 49: ...Electrical connections PE C4 circuit board 49 ...
Page 66: ...www eta co at ...
Page 67: ......
Page 68: ...www eta co at www eta co at downloads DOWNLOAD ...