Concluding activities
Electrical connections
10.7
Concluding activities
Reinstall boiler casing
Reinstall the parts of the boiler casing that were
removed during the assembly.
Removing protective film
Remove protective film from all covers. After longer
periods of operation of the boiler, the film can no longer
be removed without damaging the paint.
S512A
24 V supply
from circuit board [HA-C]: terminal [S553B]
S512B
24 V supply
S514
Analogue input
Vacuum sensor
X2
CAN bus supply GND (for standalone mode)
X3
Boot jumper
X4
CAN-Bus terminal resistor
X5
RS-485 terminal resistor
X8
Terminal for plug-in circuit board
X9
Terminal for plug-in circuit board
X24
CAN-Bus 24 V (for stand-alone operation)
These terminals have already been pre-wired at the factory:
Terminal
Function
Default assignment
Summary of Contents for ePE-K 140
Page 1: ...2020 07 21 EN 0000000451 V 008 5303 00 939074 003 Pellet boiler ePE K 140 170 kW Installation ...
Page 55: ...Installation Network connection 55 ...
Page 61: ...Electrical connections Overview of circuit boards 61 ...
Page 65: ...Electrical connections Circuit board HA C5 65 ...
Page 82: ...www eta co at ...
Page 83: ......
Page 84: ...www eta co at www eta co at downloads DOWNLOAD ...