42
www.eta.co.at
Installing flue gas recirculation
Installation
9.3
Installing flue gas recirculation
Installing the actuator
Insert the adapter into the actuator. Ensure the correct
position, the slit must be 90° offset to the screw on the
actuator.
Fig. 9-8: Adapter
Turn the actuator in the closed position (see sticker).
Also turn the air valve shaft to the fully closed position.
Place the air valve on the shaft and fix it in the actuator
with the screw.
Fig. 9-9: Actuator
Fig. 9-10: Screw
Then connect the actuator to the line already laid (on
the top of the boiler).
Fig. 9-11: Electrically connecting the actuator
Summary of Contents for 13180 LP-D
Page 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Page 55: ...Installation Network connection 55 ...
Page 61: ...Electrical connections Overview of circuit boards 61 ...
Page 65: ...Electrical connections Circuit board HA C5 65 ...
Page 85: ......
Page 86: ...www eta co at ...
Page 87: ......
Page 88: ...www eta co at www eta co at downloads DOWNLOAD ...