Scara Mechanical Unit Manual
Document Version: V1.1(
Error!
Unknown document property name.
)
© 2021
Error! Unknown document property name.
All right
reserved.
35
5.1.1.
Inspection While Power is OFF (Robot is not operating)
Inspection Point
Inspection Place
Daily
Monthly Quarterly Biannual
Annual
Check looseness or backlash
of bolts/screws. Tighten
them if necessary.
End effector mounting bolts
√
√
√
√
√
Robot mounting bolts
√
√
√
√
√
Each arm locking bolts
√
√
√
√
√
Bolts/screws around shaft
√
Bolts/screws securing
motors, reduction gear
units, etc.
√
Check
looseness
of
connectors. If the connectors
are loosening, push it
securely or tighten.
External connectors on
Robot (on the connector
plates etc.)
√
√
√
√
√
Robot cable unit
√
√
√
√
Visually check for external
defects. Clean up if
necessary.
External appearance of
Robot
√
√
√
√
√
External cables
√
√
√
√
Check for bends or improper
location. Repair or place it
properly if necessary
Safeguard etc.
√
√
√
√
√
Check tension of timing
belts. Tighten it if
necessary.
Inside of Arm #2
√
√
Grease conditions
Refer to
Greasing
.
Battery
-
Replace every 1 years
5.1.2.
Inspection While the Power is ON (Robot is operating)
Inspection Point
Inspection Place
Daily
Monthly Quarterly
Biannual
Annual
Check motion range
Each joint
√
Move the cables back and forth lightly
to check whether the cables are
disconnected.
External cables
(including cable
unit of the Robot)
√
√