34 The Installation guide
This document describes when and how to install Multi-zone ART Workstation in the IVF
clinic.
34.1 Responsibilities
All technicians or embryologists installing the Multi-zone ART Workstation must identify
problems and perform any necessary calibrations, adjustments and maintenance.
All individuals who will perform installation, repair and/or maintenance of the
instrument must be trained by Esco Medical or a qualified training center. Experienced
service technicians or embryologists conduct training to ensure that the installation
personnel clearly understand the instrument's functions, performance, testing, and
maintenance.
Installation personnel must be updated regarding alterations or additions to this
document and the "Installation report" form.
34.2 Before installation
2
–
3 weeks before the installation due, the user/owner at the clinic is contacted via e-
mail to plan the exact time to perform the installation. When a convenient time has been
determined, travel and accommodation arrangements can be made.
The released Multi-zone ART Workstation must be sent 1
–
3 weeks before installation,
depending on the clinic location. Check with shippers about local customs regulations and
delays that could arise from that.
The clinic must be informed about the site requirements before installation and should
have signed the customer requirement checklist:
1.
The lab must have an open and flat lab floor space for standing operation.
2.
The weight of the 4-ft Multi-zone ART Workstation is 225 kg, and the 6-ft is 345
kg.
3.
The required space for placement is provided in the "27 Specifications" section
tables.
4.
Temperature control should be able to maintain a stable temperature, never ex-
ceeding 30 °C.
5.
Uninterrupted power supply (UPS) with 115 or 230 V, minimum 120 W.
6.
Proper grounding.
7.
Premixed and CO
2
gas outlet with 0.6
–
1.0 atm above ambient.