background image

 

G8872_1 Installation Manual AUS 

 

10

Gas Type Conversion Procedure: 

 

 
 
 
Step one: 

 

Remove inner fascia, glass  
and logs (as described earlier  
in this manual).  
Service person may also wish  
to remove the firebox to  
increase the work space  
within the heater. 
 

Step two: 

 

Take out front two burners  
by removing the screws from  
either end of the burner top  
face. Burners can then be 
lifted out. 
 

Step Three: 

Unscrew rear burner clamp bracket 
On left side.

 

Lift out the rear burner.  

 
 
Step Four:   

Change the three jets with the  
jets supplied in kitset. Replace 
the rear burner and clamp  
bracket. Replace front two  
burners with the burners  
supplied in kitset. 
 
 

 
 
 
Step five: 

 

Take the regulator spring out  
of the regulator by unscrewing  
the pressure  adjustment knob,  
completely. Swap regulator  
spring with the new spring that is 
supplied in conversion kitset. 
Replace adjustment screw. 
 

Step six: 

 

Reset gas pressure as per  
instructions on page 6 of  
this manual. 
 
 

Step 2

 

Step 3

 

Step 4

 

Step 5

 

Summary of Contents for IB600

Page 1: ...ried out only by a suitably qualified and trained person Gas and electricity supply MUST be isolated before any service operation is carried out on this appliance This manual must be left with the app...

Page 2: ...ents Page Error Codes 3 Cleaning the Log Set and Glass 5 Checking Operating Pressure 6 Removing Cleaning Fan 7 Removing Electronic Draw 8 Replacing a Wireless Control 9 Gas Type Conversion 10 Annual S...

Page 3: ...ment in relation to the flame Ensure it is well enveloped in flame as per the diagram in the installation instructions Ensure no coals have dropped onto the ignition electrodes between the burners Ens...

Page 4: ...gain after a few seconds Valve Temp Sensor Trip The valve temperature sensor has detected abnormally high temperatures around the valves This is an unlikely fault and should it occur please contact th...

Page 5: ...eposition log set so that front edge of each log is just behind each row of holes in burner top Clear any blockage from primary air port of burner Check to make sure flue system is drawing well Step 1...

Page 6: ...tallation pipe size or upstream regulator settings Replace inlet test point screw 3 Remove the operating pressure test point screw Connect manometer tube and measure pressure with heater running on fu...

Page 7: ...THE FIRE BEFORE PROCEEDURE Remove front glass and log set as described on page 5 Step Two Remove fire box from heater by taking out the screws from each corner and Pulling fire directly outwards as sh...

Page 8: ...ee wires connecting the electronics to the igniters and flame rod must be removed manually from the PCB Printed Circuit Board ISOLATE THE POWER TO THE FIRE BEFORE PROCEEDURE Step Two Take out the two...

Page 9: ...tinguish the fire 4 Immediately after releasing the Aux On Off button turn on the remote control and wait four to five minutes During this time the fire will re ignite NOTE During this period the fire...

Page 10: ...Step Three Unscrew rear burner clamp bracket On left side Lift out the rear burner Step Four Change the three jets with the jets supplied in kitset Replace the rear burner and clamp bracket Replace f...

Page 11: ...dust from the cavity that houses the fan and solenoid valves and from the ducts down each side of the heater that lead to this cavity 8 Test all joints for gas tightness 9 Reassemble heater and check...

Page 12: ...G8872_1 Installation Manual AUS 12 Wiring Diagram...

Reviews: