4 INSTALLATION
0463 362 001
- 10 -
© ESAB AB 2013
4
INSTALLATION
4.1
General
The installation must be carried out by a professional.
4.2
Lifting instructions
WARNING!
Secure the equipment -
particularly if the ground is
uneven or sloping.
4.3
Location
Position the welding power source such that its cooling air inlets and outlets are not
obstructed.
Summary of Contents for Warrior 400
Page 2: ......
Page 21: ...DIAGRAM 0463 362 001 21 ESAB AB 2013 DIAGRAM ...