207
figure 5-2. screw fastening order
Two-Point Mounting Type
Temporary tightening
Final tightening
Four-Point Mounting Type
Temporary tightening
Final tightening
5.4 IGBt handling & replacement
Since IGBT gates are insulated from any other conducting region, care should be taken to prevent static build up, which
could possibly damage gate oxides. All IGBT modules are shipped from the factory with conductive foam contacting the
gate and emitter sense pins.
Always ground parts touching gate pins during installation. In general, standard ESD predictions application to FETs should
be followed.
Other handling precautions that should also be observed are as follows:
•
Use grounded work station with grounded floors and grounded wrist straps when handling devices.
•
Use a 100W resistor in series with the gate when performing curve tracer tests.
•
Never install devices into systems with power connected to the system.
•
Use soldering irons with grounded tips when soldering to gate terminals.
When mounting IGBT modules on a heatsink, certain precautions should be taken to prevent any damage against a sudden
torque. If a sudden torque (“one-sided tightening”) is applied at only one mounting terminal the ceramic insulation plate or
silicon chip inside the module may get damaged.
The mounting screws are to be fastened in the order shown in Figure 5-2. Also, care must be taken to achieve maximum
contact (i.e. minimum contact thermal resistance) for the best heat dissipation.
Application of a thermal pad on the contact surface improves it thermal conductivity. See Replacement Parts section for
the required pad.
A torque wrench should be used. Tighten mounting screws to 28 in-lbs; wire connecting screws to 19 in-lbs. If torque is too
heavy, the device can damage like the above “one-sided tightening”.
sectIon 5
maIntenance
Summary of Contents for Powercut 875
Page 4: ...4 table of contents ...
Page 8: ...8 OBSAH ...
Page 18: ...18 ODDÍL 3 INSTALACE ...
Page 24: ...24 ODDÍL 4 OBSLUHA ...
Page 28: ...28 INDHOLDSFORTEGNELSE ...
Page 38: ...38 SEKTION 3 BETJENING ...
Page 44: ...44 SEKTION 4 BETJENING ...
Page 48: ...48 INHOUDSOPGAVE ...
Page 58: ...58 HOOFDSTUK 3 INSTALLATIE ...
Page 64: ...64 HOOFDSTUK 4 BEDIENING ...
Page 68: ...68 table of contents ...
Page 78: ...78 SECTION 3 INSTALLATION ...
Page 84: ...84 SECTION 4 OPERATION ...
Page 88: ...88 SISUKORD ...
Page 98: ...98 OSA 3 PAIGALDAMINE ...
Page 104: ...104 OSA 4 KASUTAMINE ...
Page 108: ...108 SISÄLLYSLUETTELO ...
Page 118: ...118 KAPPALE 3 ASENNUS ...
Page 124: ...124 KAPPALE 4 KÄYTTÖ ...
Page 128: ...128 table DES MATIÈRES ...
Page 138: ...138 SECTION 3 INSTALLATION ...
Page 144: ...144 SECTION 4 FONCTIONNEMENT ...
Page 148: ...148 INHALTSANGABE ...
Page 158: ...158 ABSCHNITT 3 INSTALLIERUNG ...
Page 164: ...164 ABSCHNITT 4 BEDIENUNG ...
Page 168: ...168 TARTALOMJEGYZÉK ...
Page 178: ...178 3 SZAKASZ ÖSSZESZERELÉS ...
Page 184: ...184 4 SZAKASZ MŰKÖDÉS ...
Page 188: ...188 INDICE ...
Page 198: ...198 SEZIONE 3 INSTALLAZIONE ...
Page 204: ...204 SEZIONE 4 FUNZIONAMENTO ...
Page 216: ...216 section 6 replacement parts ...
Page 217: ...217 section 6 replacement parts ...
Page 218: ...218 section 6 replacement parts ...
Page 219: ...219 section 6 replacement parts ...
Page 220: ...220 section 6 replacement parts ...
Page 221: ...221 section 6 replacement parts ...
Page 222: ...222 section 6 replacement parts ...
Page 223: ...223 section 6 replacement parts ...
Page 224: ...224 section 6 replacement parts ...
Page 225: ...225 section 6 replacement parts ...
Page 226: ...226 section 6 replacement parts ...