Erreka VULCAN D User Manual Download Page 1

English

VULCAN_TOC.fm - 

21/2/13

VULCAN D Hydraulic operator

41

INDEX

General safety instructions

42

Symbols used in this manual__________________________________ 42
Importance of this manual ___________________________________ 42
Envisaged use ______________________________________________ 42
Installer's qualifications ______________________________________ 42
Automatic safety elements ___________________________________ 42

Description of the product

43

Elements of the complete installation __________________________ 43
General features of the operator ______________________________ 44
Main operator parts_________________________________________ 44
Technical features of the operator _____________________________ 45
Manual operation __________________________________________ 46
Declaration of conformity ____________________________________ 46

Unpacking and contents

47

Unpacking_________________________________________________ 47
Content___________________________________________________ 47

Installation

48

Required tools _____________________________________________ 48
Initial conditions and checks__________________________________ 48
Installing the operator _______________________________________ 49
Final preparation ___________________________________________ 57

Maintenance and diagnosis of failures

58

Maintenance_______________________________________________ 58
Failure diagnosis____________________________________________ 58
Spare parts ________________________________________________ 59
Scrap _____________________________________________________ 59

Summary of Contents for VULCAN D

Page 1: ...r_____________________________ 45 Manual operation __________________________________________ 46 Declaration of conformity ____________________________________ 46 Unpacking and contents 47 Unpacking__...

Page 2: ...priate and hazardous and could lead to accidents or failures 4 INSTALLER S QUALIFICATIONS Installation should be completed by a professional installer complying with the following requirements He she...

Page 3: ...tocells 5 Key switch 6 Wall pushbutton 7 Control board 8 Connections box 9 Electrical installation 10 Interior photocells 11 Electrolock 12 Stop on closing ELECTRICAL WIRING Element N wires x section...

Page 4: ...which contains a hydraulic pump and a drive piston VUA Models with slow down The VUA models have a slow down system in the spindle meaning the speed slows down when approaching the end of the extensio...

Page 5: ...e quickly Model General M Models Power supply V Hz 230 50 125 60 Absorbed current A 0 7 1 3 Power consumed W 160 160 Capacitor F 10 20 Protection factor IP 65 Maximum thrust N 3 000 Spindle speed mm s...

Page 6: ...with Standards EN 13241 1 and EN 12453 provided it is correctly installed The installer shall be responsible for proper installation The VULCAN D electromechanical operator complies with safety legisl...

Page 7: ...may cause injury 2 Check the content of the package see figure below Should it be noticed that a piece is missing or deteriorated contact the nearest technical service 2 CONTENT Fig 3 VULCAN D operat...

Page 8: ...gate must have an opening and a closing stopper The gate must be easy to handle manually namely It must be balanced in order to ensure the effort made by the motor is minimum There should be no stiffn...

Page 9: ...gards to the gate and its turning axis O IT IS VERY IMPORTANT TO RESPECT THE LEVELS If the levels are not respected exactly the spindle will not make the whole open close meaning the slow down system...

Page 10: ...chosen for a specific opening angle Generally one of them will be determined by the features of the installation size of the pillar presence of walls etc 1 Use the chart to select the specific level...

Page 11: ...be chosen for a specific opening angle Generally one of them will be determined by the features of the installation size of the pillar presence of walls etc 1 Use the chart to select the specific lev...

Page 12: ...tach the supports on sufficiently robust structural elements O IT IS VERY IMPORTANT TO RESPECT THE LEVELS If the levels are not respected the spindle will not make the whole open close meaning the slo...

Page 13: ...e spindle 1 in the front support 2 2 Lubricate the tip of the spindle 1 and the housing orifices with grease 3 Position the screw 3 with its corresponding nut 4 1 Introduce the fork 1 in the support 2...

Page 14: ...2 Position the gland in the cover 4 and attach using the PG11 nut 2 P240H CAUTION VERY IMPORTANT Once the operator is mounted on the supports turn the discharge screw 1 once to allow the correct opera...

Page 15: ...no person or object in the radius of action of the gate and the drive mechanisms 5 Use the PUL1 PUL2 control board mini pushbuttons CLOSE OPEN to check the motor connections are correct turning direc...

Page 16: ...ng Pressure is more exactly the pressure during the retraction of the spindle In inward opening facilities it corresponds to the opening operation In outward opening facilities it corresponds to the c...

Page 17: ...ldren must not be allowed to play with the device Cleaning and maintenance must not be carried out by children unless supervised 1 Carry out the installation and the connections for all the elements o...

Page 18: ...k these elements using their respective manuals Defective capacitor Check the state of the capacitor When using the opening or closing key devices the operator is activated but the gate does not move...

Page 19: ...its location by an installer who is as well qualified as the person who completed the assembly observing the same precautions and safety measures In this manner possible accidents and damage to adjac...

Reviews: