ERKO SH/400 Technical And Operational Documentation Download Page 18

18 

11. The warranty 

 

1.  This warranty covers product repairs on condition that it is operated in 

compliance with its instructions’ manual. 

 

2.  The guarantee period is 12 months from the purchase date. 

 

3.  The manufacturer guarantees full technical support in Poland. 

 

4.  Parts and materials which are to be exchanged during the correct usage of 

the product (oil, filter inputs etc.) are not under the guarantee. Parts and 
materials provided by cooperating companies are guaranteed on their 
conditions.  

Other repairs will be performed at least 3 days after the date of complaint. 

 

5.  This warranty does not concern damages caused by improper usage,  

maintenance, transportation and storage of the product. 

 

6.  The guarantee will become void if any unauthorised modification is performed 

on the product. 

 

7.  This guarantee will also be void if the manufacturer’s leaden seals of unit 

safety valve are broken. 

 

8.  Operational requirements also concern the purity of oil and its adequate 

hydraulic level. It always has to be class 9 according to the NAS 1638 norm, 
otherwise the guarantee is void. 

 

9.  In order to make a complaint it is necessary to deliver the product with the 

guarantee card and detailed damage description to the manufacturer or to the 
point of sales.  

 

10. The manufacturer is not responsible for damages caused by product’s 

defects. Neither these damages repairs nor expenses and lost income return 
is under the guarantee. 

 

 

Purchasing date:  

Invoice no.: 

  Sales 

representative 

signature: 
 
 
 
 
 
Dear User, 
 

Thank you for selecting this product and welcome you to the growing 

family of our satisfied product owners. 

Any remarks or suggestions to our products will be greatly appreciated. 

ERKO®, manufacturer

 

 
ERKO® has the right to make improvements to the machine construction. 
 

ERKO company reserves the right to technical changes improving/modernizing its products.

 

Summary of Contents for SH/400

Page 1: ...anowskiego 7 str 11 042 JONKOWO POLAND tel fax 0048 89 5129273 4 lines e mail export erko pl www erko pl ISO 9001 ISO 14001 Technical and Operational Documentation Conductor rail machining station ERK...

Page 2: ...ponsibility declares that the machine Conductor rail machining station type SH 400 SWW 0792 Polish Classification of Goods and Services PKWiU 29 56 25 90 90 being the subject of herein statement confo...

Page 3: ...uarantee certificate 19 13 REPAIR LIST 19 Figures Fig 1 General view 11 Fig 2 Punching and profiling segment punching holes 12 Fig 3 Punching and profiling segment profiling 12 Fig 4 Punching and prof...

Page 4: ...for screws from M6 to M16 5 sets dies and punches Profiling range from 0 to 90 1 set pins and profiling insertion 3 External die terminal 3 1 pc terminate in a fast terminal PM type Equipment that co...

Page 5: ...rofiling segment 2 at a required height with the use of the crank 6 according to the ruler 7 3 With the vertical ruler 8 set the hole distance from the bar end 8 4 Start the machine W1 5 Select machin...

Page 6: ...nd the profiling insertion 12 will return to its initial position Fig 1 and Fig 3 illustrate particular elements Offsetting 1 Fit the offsetting insertion 17 2 Set the punching and profiling segment 2...

Page 7: ...6 2 Remove the front plate 11 3 Lubricate the bolt 5 Work Safety and hygiene manual 1 Only personnel familiar with the Technical and Operational Documentation are to operate the SH 400 machining stati...

Page 8: ...of body or machine damage 6 Troubleshooting Problem Cause Solution 1 After starting the machine the power diode does not light a no power supply b no 1 phase c voltage fall to 175V phase Check the pow...

Page 9: ...8 shield extreme position W5 angle extreme position W3 machining mode selector W1 main power switch W4 circuit breaker W3 K16R 4 858 PO3 W4 XB2 ES542 W5 TM1306 W6 PCID 1 5RP NC MB W7 TM1701 W8 TM1306...

Page 10: ...ERKO SH 400 02 13 13 Punch M20 1 ERKO SH 400 02 13 14 Die 8 5 12 1 ERKO SH 404 01 02 15 Die 11 16 1 ERKO SH 404 01 02 16 Die 13 18 1 ERKO SH 404 01 02 17 Die 17 21 1 ERKO SH 404 01 02 18 Punch 8 5 12...

Page 11: ...es Conductor rail machining station SH 400 Fig 1 General view W1 W2 11 W3 L1 L2 L3L4 21 W4 L5 3 5 2 8 W7 13 14 7 6 1 4 15 ERKO company reserves the right to technical changes improving modernizing its...

Page 12: ...g segment punching holes 10 9 Fig 3 Punching and profiling segment profiling Fig 4 Punching and profiling segment offsetting W6 11 W5 13 14 12 ERKO company reserves the right to technical changes impr...

Page 13: ...r HGD 100 01 06 A 3 Piston SIH 63 01 02 4 Spring SIH 63 01 03 5 Guiding barrel Igus GSM 4044 6 Insulation Busak Schamban PS1400630 T46N 7 O ring Busak Schamban ORID04750 8 Guiding ring Busak Schamban...

Page 14: ...1 01 02 2 Connector SH 400 01 03 3 Cylinder HGD 100 01 06 A 4 Piston SIH 63 01 02 5 Spring SIH 63 01 03 6 Insulation Busak Schamban PS1400630 T46N 7 O ring Busak Schamban ORID04750 ERKO company reserv...

Page 15: ...tion Technical specifications power output electric engine 1 1 kW max pressure 700 bar nominal efficiency 1 25 l min power supply voltage 380 V 50 Hz operation 24 V DC working medium L HM 32 Gda sk Re...

Page 16: ...5 Operation manual Operation according to the Technical and Operational Documentation SH 400 The manufacturer set the maximum working pressure at the emergency valve at 400 bar or 680 bar depending on...

Page 17: ...ded The suction filter cleanliness should be checked as well If required it should be washed or replaced with a new one After a refill oil should fill the capillary vessel of the oil indicator Use HLP...

Page 18: ...if the manufacturer s leaden seals of unit safety valve are broken 8 Operational requirements also concern the purity of oil and its adequate hydraulic level It always has to be class 9 according to t...

Page 19: ...nd stamp KJ Invoice no Date sold Date purchased Sales Representative signature Sales Representative signature 13 REPAIR LIST No Date of receipt for repair Date of repair return Repair remarks Signatur...

Reviews: