Select to Verify
Running Product
Immediately
Sets Reference
Time for
Verification
Interval
Sets Time
Between
Scheduled
Verifications
Sets the Amount
of Time After
Being Alerted
That User Has to
Perform a
Verification
before a Fault
Occurs
Verification Is
Not Required
between Stop
Time and Start
Time
Displays Time of
Next Scheduled
Verification
NOTE: This screen requires at least “QC Level” to view.
If your company runs 24/7 it is recommended that you set the start
time to 00:01 and the stop time to 23:59.
References Next
Verification from Start
When Enabled or Last
Verification when Disabled
UI
VERIFICATION SCHEDULE
57
Summary of Contents for Xtreme
Page 2: ......
Page 8: ...6 ...
Page 31: ...FIGURE 1 TERMINAL CONNECTIONS FIGURE 2 TERMINAL CONNECTIONS ELEC 29 ...
Page 33: ...FIGURE 4 OUTPUT CONNECTION EXAMPLES ELEC 31 ...
Page 34: ...FIGURE 5 INPUT CONNECTION EXAMPLES ELEC 32 ...
Page 94: ...PLC 92 ...
Page 95: ...PLC 93 ...
Page 96: ...PLC 94 ...
Page 97: ...PLC 95 ...
Page 98: ...PLC 96 ...