![Ergoswiss 901.20024 Operating Instruction Download Page 19](http://html1.mh-extra.com/html/ergoswiss/901-20024/901-20024_operating-instruction_2422427019.webp)
Operating Instruction
Spindle lifting system SL/SM compact
Document no.: B-00061
Edition 2018 02
operating instruction EN
Copyright by Ergoswiss AG
19/23
7.2
Connecting the safety strip
The safety strip is compatible with the control box compact-3-eco.
When installing the system up to two safety strips can be mounted and operated at a potential squeeze
zone. The length of the contact tube can
be freely selected from 0 to 5’000
mm of length.
Single version
Double version
For this the split cable
124.00084 is needed.
NOTE
If it is necessary to attach a PXD SYNC cable to the control box in addition to the safety
strip, both can also be connected with the split cable.
Gluing the contact tube in the squeeze zone
Connecting the safety strip
1.
Clean and degrease the contact face
2.
Pull off a liner of acrylic foam of 10 to 15 cm
3.
Place it on the contact face and press on well
4.
Repeat steps 2 and 3 until the contact tube is
completely glued on
5.
Maximum adhesion is reached after 24 h
1.
Wire the drive.
2.
Run the cable 124.00107 orderly to avoid en-
tanglement
3.
Connect the adapter plug to the control box
4.
The safety strip must be connected to the con-
trol box before the control box is connected to
the mains.
NOTE
The safety strip must be connected to the control box before the control box is connected to
the mains. If the safety strip is connected afterwards, it will not be recognised by the control
box.