Super Shot 125 DC 70CFM EU Part Manual
Chapter 5 Operating Instructions
©2022 by Crafco, Inc. All Rights Reserved
………………..…………………………………..….Operating Instructions 5-9
5.8 Loading Material into the Sealant Tank
This unit is equipped with a safety interlock system on the loading door. This system disables the
mixer hydraulic system when the lid is open. This is a safety feature for the operator and should
never be disabled for any reason.
WARNING
Personal injury could occur if this safety system is disabled.
Step
Action
WARNING
Following this procedure prevents hot material from getting on operators and causing
severe burns. Never throw blocks of material directly into tank. Hot material splash
hazard will result.
1
To load material into the sealant tank first open the lid. For approximate material
volume see
Table 5-7 Material Tank Depth Chart
2
Place the solid material on the lid then close the lid.
3
Continue adding solid material at intervals to allow the mixer to rotate without
jamming.
Note:
If blocks of solid material are added too quickly, jamming results and slows
down the melting process.
Note:
When sealant placement volume is low, or the crew has stopped working for
lunch, hot oil and material temperatures can equalize. To lower material temperature
add a few blocks of cold sealant. This may not be an option if the tank is full.
Table 5-6 Loading Material into the Sealant Tank
Summary of Contents for Crafco SUPER SHOT 125
Page 1: ...Parts Manual 26635N Revision E SUPER SHOT 125 DIESEL COMPRESSOR 70CFM EU MELTER...
Page 4: ...Super Shot 125 Diesel Compressor 70 CFM EU Melter PN 48300N...
Page 5: ......
Page 16: ......
Page 26: ......
Page 42: ......
Page 72: ......
Page 76: ......
Page 120: ......
Page 170: ......
Page 174: ......
Page 175: ......
Page 176: ...2022 Crafco Inc...