
L565/L566 Series
Revision A
Disassembly/Reassembly
Routing FFCs/cables
54
Confidential
Panel FFC
Route the Frame Base and Main Frame along the folded line and secure
with the double-sided tape on the position shown in the above.
After installing the Housing Front, route the Panel FFC through the hole
of the Housing Front.
Housing Front
Main Frame
Panel FFC
Frame Base
Hole
Double-sided tape
Panel Unit
Route the Panel FFC and grounding wire as follows before installing the
Panel Unit.
•
Route the Panel FFC through the hole of the Panel Unit and connect the
connector of the Panel Board.
•
Route the grounding wire through the hole of the Housing Front.
After installing the Panel Unit, secure the grounding wire to the Main
Frame on the position indicated in the figure above with screw (x1).
Hole
Connector of
Panel Board
Main Frame
Panel FFC
Grounding wire
Housing Front
Panel Unit
C.B.S-TITE SCREW 3x6 F/ZN-3C (6 ± 1 kgf· cm)
PF Encoder Sensor
Route the PF Encoder through ribs of the Main Frame and connect the
connector (CN7) of the Main Board. Then secure with the double-sided tape
(x2) on the position shown in above.
Left side of printer
PF Encoder Sensor
PF Encoder FFC
Rib
Double Side Tape
CN7
Ribs
Right side of Main Board
Connect the following cables/FFCs to the Main Board as shown in the figure
above.
•
Paper sensor (CN6)
•
CR Motor cable (CN12)
•
CR Encoder FFC (CN61)
•
Head FFC (CN102)
Main Board
CN12
CN102
Head FFC
CR Encoder FFC
CN61
CR Motor cable
CN8
Paper sensor FFC
Left side of Main Board
Connect the following cables/FFCs to the Main Board as shown above.
• PF Motor cable (CN13)
• PS Unit cable (CN501)
• Wireless LAN Module Cable (CN4: only for L555 Series)
• PF Encoder FFC (CN7)
• Ethernet Board cable (CN14: only for L550 Series)
• FAX FFC (CN1)
• Panel FFC (CN2) : Secure the ferrite core of the FFC Holder MB and connect to the Main Board through the ferrite core.
FFC Holder MB
Ferrite core
Panel FFC
PF Encoder
FFC
L555 Series
Wireless LAN
Module Cable
FFC Holder MB
Ferrite core
Panel FFC
PF Encoder
FFC
L550 Series
PF Motor cable
FAX FFC
PS Unit cable
Ethernet Board cable
CR Motor
Route the CR Motor cable as follows before installing the Shield Plate.
1. Route the CR Motor cable (black) around the rib A of the Frame Base (two turns).
2. Route the CR Motor cable (red) through the rib B of the Frame Base, and then route it through the rib A taking care not to let the CR Motor cable (red)
come over the CR Motor cable (black).
3. Twist the CR Motor cable (black) and CR Motor cable (red) twice, and then route them through the hook C of the Main Frame.
4. Route the CR Motor cable (black) and CR Motor cable (red) in the order of hook D of the Main Frame, groove of the FFC Holder, and hook E of the Main
Frame.
CR Motor cable (red)
Rib A
CR Motor cable (black)
Hook C
Rib B
CR Motor
Hook E
Groove of FFC Holder
CR Motor cable
Hook D
Summary of Contents for L565
Page 1: ...SERVICE MANUAL CONFIDENTIAL Color Inkjet Printer L565 L566 SEMF14 012 ...
Page 8: ...Confidential CHAPTER 1 TROUBLESHOOTING ...
Page 17: ...Confidential CHAPTER 2 DISASSEMBLY REASSEMBLY ...
Page 56: ...Confidential CHAPTER 3 ADJUSTMENT ...
Page 70: ...Confidential CHAPTER 4 MAINTENANCE ...