2.
Installation & commissioning
2.1
Transport and storage
2.1.1
Transport
•
The handles on the front and rear side of the device are
not
for carrying!
•
Because of its weight, transport by hand should be avoided where possible. If unavoidable then
only the housing should be held and not on the exterior parts (handles, DC output, rotary knobs).
•
Do not transport when switched on or connected!
•
When relocating the equipment use of the original packing is recommended
•
The device should always be carried and mounted horizontally
•
Use suitable safety clothing, especially safety shoes, when carrying the equipment, as due to
its weight a fall can have serious consequences.
2.1.2
Packaging
It’s recommended to keep the complete transport packaging for the lifetime of the device for relocation or return
to the manufacturer for repair. Otherwise the packaging should be disposed of in an environmentally friendly way.
2.1.3
Storage
In case of long term storage of the equipment it’s recommended to use the original packaging or similar. Storage
must be in dry rooms, if possible in sealed packaging, to avoid corrosion, especially internal, through humidity.
2.2
Unpacking and visual check
After every transport, with or without packaging, or before commissioning, the equipment should be visually
inspected for damage and completeness using the delivery note and/or parts list (see section
). An obviously damaged device (e.g. loose parts inside, damage outside) must under no circumstances
be put in operation.
2.3
Installation
2.3.1
Safety procedures before installation and use
•
The device has a considerable weight. Therefore the proposed location of the equipment (table,
cabinet, shelf, 19” rack) must be able to support the weight without restriction.
•
When using a 19” rack, rails suitable for the width of the housing and the weight of the device
are to be used (see
“1.8.3. Specific technical data (380/400/480 V models)“
cific technical data (208 V models)“
)
•
Before connecting to the mains ensure that the supply voltage is as shown on the product
label. Overvoltage on the AC supply can cause equipment damage.
2.3.2
Preparation
Mains connection for the PSI 10000 4U series is done via the included 5 pole plug and on the back of the device.
Wiring of the plug is at least 4 wire (3x L, PE) of suitable cross section and length. Full configuration with N is
permissible. For recommendations for a cable cross section see
“2.3.5. Connection to AC supply“.
Dimensioning of the DC wiring to the load/consumer has to reflect the following:
•
The cable cross section should always be specified for at least the maximum current of the
device.
•
Continuous operation at the approved limit generates heat which must be removed, as well as
voltage loss which depends on cable length and heating. To compensate for these the cable
cross section should be increased and the cable length reduced.