background image

Envertech EVT300 Quick Installation Guide

Please read and follow the safety and installation

instructions below. You can find and download the

instructions or other technical documents on our

website:

www.envertec.com

.

Components

Microinverter

Monitoring Device

EnverPortal

EVT300

EnverBridge

www.envertecportal.com

PV

Module

60-cell / 72-cell module

AC

Extension

Cable

(Optional)

To connect the AC side to

the grid.

Three-wire cable:

AWG12 or above.

AC End

Cap

To seal the end of

unused AC cable.

Envertech EVT 300 Microinverter Installation

1.

Mount microinverters onto the rack

Mark out the estimated center of each PV module on the rack to facilitate locating

microinverters..
Mount all microinvertes under modules to avoid rain and sun, with the trademark

facing downward.

Please make sure that there are less than 20 units of EVT300 in each

branch(12AWG).

2.

Grounding

Microinverters and modules must be connected to the grounding conductor in

accordance with national standards.
Fix the grounding wire with screws to the microinverter’s grounding hole, so that the

grounding of microinverters can be realized.

3.

Connect microinverter AC cables serially

Connect the AC connectors on both sides of microinverters in a hand-in-hand way.

4.

Fastern AC cables

Fasten AC cables and grounding cables to the rack with cable ties.

5. Seal the unused connector of AC cable

Insert the end cap directly into the connector on the unused end, and check if it is

inserted in place.

6. Connect AC cable to the junction box

Connect AC cable to the input of the junction box.

7. Mount EnverBridge

Option 1: Indoor installation

I

1. Turn off the air switch and connect

EnverBridge to the socket. This

operation should be done under the

instruction of professionals.

2. Fix EnverBridge at proper position in

or close to the distribution box

3. Open the cover on the right side of

EnverBridge.

Run the

RJ45 cable

through the waterproof connector and

connect it to the network input. Close

the cover and recheck if it’s completely

sealed

4. Run the RJ45 cable and connect the

other side to your router;

5. Put the EnverBridge plug into the

socket.

Option 2: Indoor installation

II

1. Open the cover on the right side of

EnverBridge.

Run the

RJ45 cable

through the water proof connector and

connect it to he network input. Close the

cover and recheck if it ’ s completely

sealed;

2. Run the RJ45 cable and connect it to

your router;

3. Fix EnverBridge at proper position in

or close to the distribution box;

4. Turn off the air switch and connect

EnverBridge ’ s power cable to the air

switch.

This operation should be done under the

instruction of professionals.

8.

Prepare AC extension cable

1

Remove the skin of the two ends of the extension cable by y=40mm and remove

the skin of internal wires by x=14mm. Set the metal terminals onto the open parts

and clamp them to tighten the connection;

Y=40mmR

Y=14mmR

2

Connect one side of the extension cable to the junction box;

3

Connect the other side of the extension cable to the air switch.

Installation could only be implemented when the system is

disconnected from the grid, and the solar panel has been covered

or disconnected.

Reviews: