ENSTROM 480/480B RFM SUPPLEMENT
8-1
Report No. 28-AC-041
Dec 17/10
CHAPTER 8. HANDLING, SERVICING, AND MAINTENANCE
8-1. General
1. Refer to the basic RFM.
2. In addition to the information set forth in the basic RFM,
the following handling, servicing, and maintenance
requirements are as noted below.
8-2. Grounding
1. After landing, ground the helicopter using Enstrom
grounding device, P/N 4230006-1.
2. Insert the grounding device plug into the grounding
receptacle below the fuel filler port on the left side of the
aircraft.
3. Stake the grounding rod into the ground.
This electronic document is not linked to a subscription for revision control or distribution. Refer to the Optional Equipment
Supplement Publications Status link under the Technical Support Page of the Enstrom Helicopter website for the current revision
level of this Rotorcraft Flight Manual Supplement.
UNCONTROLLED COPY WHEN DOWNLOADED OR PRINTED