42
(2)
23” Rack installation:
Change the position of the two mounting brackets to mount the 3U rack-mount in a 23-inch
EIA 310 C standard rack.
(3)
Tower installation:
a.
Move the mounting brackets from the front to the side and attach the brackets by screws.
Then let the UPS stand with the vertical direction as the below pictures shown.
b.
Rotate the control panel unit from horizontal to vertical direction.
19” rack
23” rack width
Summary of Contents for EVO UPS 10000VA
Page 1: ...I U P S 6K VA 10K VA USER S MANUAL 2011 11 v 1 0 ...
Page 12: ...12 10000VA Tower Rear panel ...
Page 37: ...44 ...