  I N S T A L L A T I O N   I N S T R U C T I O N 

Installing 

Enphase CT-200-Clamp

Use this instruction with the 

Enphase IQ Gateway Quick Install Guide

 to install Enphase consumption monitoring Current Transformers (CTs). 

The Enphase IQ Gateway uses a pair of clamp CTs for monitoring consumption. They perform metering with an accuracy class of 1%. Rated at 

Pollution Degree 3, you can use the CT inside electrical equipment in residential or in harsh, industrial conditions. Read and follow all warnings and 

instructions in this instruction and in the Quick Install Guide included with your Envoy and available at 

enphase.com/support

INSTALLATION

For more information, see the reverse of this document for tips. Refer also to 

the 

IQ Gateway Quick Install Guide

.

Preparation

A )  If not already done, de-energize the home load panel and the PV 

system.

Remove any pre-installed consumption CTs

A )  Remove the line 1, and line 2 conductors circuit to which the con-

sumption CTs are connected.

B )  Remove the existing CTs.

Install the consumption CTs

A )  Refer to the diagram on the reverse of this document for wiring.
B )  Install the 

consumption

 CTs on active phases as required:

• 

Locate the arrow on the CT label.

• 

Make sure that the AC mains wire(s) are de-energized until you 

have secured the CT wires in the terminal blocks.

  To monitor consumption on Line 1

Connect the white wire to the white “C1” and the blue wire to the 

blue “C1” terminal.

Clamp the CT on the main supply Line 1. When the consumption 

CT is on Line 1 conductor, the arrow must point toward the load 

(away from the grid). 

• 

To monitor consumption on Line 2

Connect the white wire to the white “C2” terminal and the blue 

wire to the blue “C2” terminal.

Clamp the CT on the main supply Line 2. When the consumption 

CT is on Line 2 conductor, the arrow must point toward the load 

(away from the grid). 

 

Tighten all connections to 5 in-lbs (0.6 N m).

C )  Close and secure the terminal block door of the Envoy.
D )  Turn on the PV system.

SAFETY

SAFETY AND ADVISORY SYMBOLS

+

DANGER

: This indicates a hazardous situation, which if not avoid-

ed, will result in death or serious injury.

NOTE

: This indicates information particularly important for opti-

mal system operation. Follow instructions carefully.

SAFETY INSTRUCTIONS

+

DANGER

: To reduce the risk of electric shock, always open or 

disconnect circuit from power-distribution system (or service) of 

building before installing or servicing current transformers.

+

DANGER

: Risk of electrocution! Do not install CTs when current 

flowing in the sensed circuit. Always install CT wires in the termi

-

nal blocks before energizing the sensed circuit.

+

DANGER

: If equipment is used in a manner not specified by 

Enphase Energy, the protection provided by the equipment may 

be impaired.

+

DANGER

: Risk of electric shock.  Be aware that installation of this 

equipment includes risk of electric shock. If you wire the IQ Envoy 

the main load center before beginning wiring. If the subpanel 

cannot be de-energized, a qualified electrician may safely install 

the CTs as directed, making sure to connect the leads and then 

place the CTs around each wire and latch.

+

DANGER

: Risk of electric shock. Risk of fire. Only qualified per

-

sonnel should troubleshoot, install, or replace the CTs.

NOTE: 

Because of variance in switchboard design and main power 

feed, there may not always be enough space to install CTs.

NOTE

: Do not install the CTs in a switchboard where they exceed 

75% of the wiring space of any cross-sectional area within the 

equipment.

NOTE

: Perform all electrical installations in accordance with all 

national and local electrical codes.

NOTE: 

Restrict installation of current transformers in an area 

where they would block ventilation openings, or in area of breaker 

arc venting.

NOTE:

 Not suitable for Class 2 wiring methods and not intended 

for connection to Class 2 equipment.

NOTE: 

Secure current transformer and route conductors so that 

they do not directly contact live terminals or bus.

NOTE: 

When wiring the IQ Envoy for production and consumption 

metering, be sure to install the current transformers (CTs) exactly 

as described for your application.

NOTE: 

When installing CTs, it is important to match CT and sense 

voltage phases. Be sure to consistently identify the two AC lines 

at three points: the main load center feed, the Envoy, and the 

solar production circuit breaker. Wire colors (typically black and 

red) may not always consistently identify L1 and L2. If in doubt, 

use a multimeter to check.

NOTE: 

Only run active conductors through the CT. The CT can 

monitor multiple active conductors. You may run more than one 

wire through the CT if all wires are on the same phase and they fit 

the opening in the CT.

SPECIFICATIONS

SPECIFICATION

CT-200-CLAMP

CT type

CLAMP CT

CT accuracy (error rate) 

<1%

Max primary supported current

200A

Turns ratio

2400

Pollution degree

3

Dimensions (inches)

2.75 * 2.12 * 0.61

Aperture Diameter (inches)

0.87

Primary voltage

250VAC

Frequency

50-60Hz

Operating temperature

-40 to 85 degree C

Humidity

95%

Compliance

UL2808 certified with service entrance 

rating, ROHs