USER MANUAL
STM 550X / EMSIX
–
ENOCEAN MULTI-SENSOR
© 2020 EnOcean | www.enocean.com F-710-017, V1.0
STM 550x / EMSIx User Manual | v1.0 | February 2020 | Page 74/79
9
Installation recommendations
9.1
Setup instructions
Before installing STM 550x into its intended location, a sufficient initial charge should be
provided to STM 550x and its correct operation should be verified.
To do so, follow these steps:
1.
Place STM 550x under bright light (daylight or bright light source) for 5 minutes to
provide an initial charge
2.
Press the LRN button once so that STM 550x will start operation
3.
Check that STM 550x transmits radio telegrams at the configured update interval
(by default once every 60 seconds). The LED will blink every time a telegram is
transmitted (unless this has been disabled via NFC).
4.
Use a suitable receiver to capture the STM 550x data telegrams and verify that all
required parameters are reported. Consider disabling the measurement and report-
ing of non-required parameters to conserve energy.
5.
Check the light level reported by STM 550x at the intended installation location to
verify that sufficient light is available for the energy harvesting functionality. Maxim-
ize the amount of light available for energy harvesting as much as possible.
6.
Make sure that the installation location is chosen according to the guidelines in the
subsequent chapters to maximize the measurement accuracy.
After those steps, STM 550x is ready for installation into its intended location.