
M
ED
A
IR
2000
ENMET
Corporation
5
3.0 Installation
3.1 Mounting of Instrument
The
M
ED
A
IR
2000
should be located near the pipe or tank containing the air to be monitored, and upstream from
where the air is being used. So that, the air sample enters the instrument before it reaches the users.
Upright (plumb and level) vertical orientation of the instrument is necessary for proper operation. Mount the
instrument on an appropriate vertical surface using the mounting flanges provided. Avoid areas with excessive
vibration. The holes in the flanges are 0.31 inch in diameter and form a 6 x 10.75 inch rectangle.
See Figure 3.
ALARM
ACKNOWLEDGE
AUDIO
DEFEAT
FAULT
POWER
SELECT
OPTION
Dimensions are in inches.
Figure 3: M
ED
A
IR
2000
Mounting Dimensions
Mounting Holes
0.31” dia. 4 places
Summary of Contents for MED AIR 2000
Page 2: ......
Page 26: ...ENMET Corporation MED AIR 2000 22 Notes...
Page 28: ......
Page 30: ......